







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterVanities, Tile & Fixtures in Boulder City, NV
Vanities, tile and fixtures are the three surfaces a bathroom is judged by, and in Boulder City they fail early for reasons specific to this town. The right extent of work depends on whether your water lines are still delivering the mineral-heavy Colorado River water that comes through our system, how much of the original 1930s-era plaster substrate is still sound, and whether the vanity configuration predates the formica-and-basin conversions we see across the Historic District. Spring installs are quick. Surprises are not. If any of the answers are unclear before demo day, call us first at (888) 282-1693, and we’ll walk through what to expect.
Bathroom vanities, tile and fixtures are the visible, touchable part of a bathroom remodel: the vanity cabinet and top, the floor and wall tile, the shower valve, drain assembly, mirror, faucet, towel bars, cabinet hardware and lighting trim. Replacing any one of these is a defined project. Replacing the vanity and tile together is a room rebuild, and that’s where most of our Boulder City work happens: the vanity has to come out to tile the floor properly, the tile has to come out to fix the substrate, and on pre-war buildings, the substrate usually needs a conversation of its own.
We handle bathroom remodeling across Boulder City as a full job, not a swap-out. That means the vanity you pick is the one we fabricate the tile layout around, and the tile and waterproofing are inspected before the fixtures go on. If you want the broader context of how this fits into a whole-room project, start with our Bathroom Remodeling in Boulder City page and come back here for the parts that matter most.
Key Takeaways
- Combined vanity-and-tile work in Boulder City runs $4,800 – $9,400 for a standard 5×8 bathroom; a full bathroom vanity, tile and fixtures replacement can reach $14,000 in a larger or older home.
- Water and humidity in Boulder City dry out caulk, grout and sealing faster than in most markets. Re-sealing is a maintenance task, not a reinspection.
- Older homes in Boulder City often hide original substrate, cast-iron drains or oddly sized thresholds under the current tile. We plan for what we find, not what we assume.
- Our technicians have up to 12 years of experience, and every job comes with the 730-Day Done Right Promise.

When You Need Vanities, Tile & Fixtures
These are the calls we get, more or less in the order we get them. If you see your own situation on this list, the right time to call is before the problem goes further than a wipe-down can address.
- Tile grout is crumbling in the shower floor: Between dry summers and the mineral crust that accumulates from our water, grout and caulk open up faster than the ten-year rule of thumb would suggest. Loose grout in a shower pan allows water into the substrate. Once it gets there, the tile is the cheapest part of the repair.
- The vanity cabinet has swelled or the particle board is soft at the toe kick: This is common in Boulder City bathrooms with a floor-mounted vanity and a slab-on-grade construction. Old leaks in the shutoff valves work their way under the cabinet base and stay there. A new vanity isn’t cosmetic in that case. It’s the way to see and stop the source.
- The vanity top is still a 1980s pink or almond laminate with an integrated backsplash: We’re not in the business of trading a functional vanity for a new one with the same problem. If the cabinet frames are sound, a stone or quartz top and a new tile floor can completely change the room at half the cost of a cabinet replacement.
- You want a curbless shower or a larger shower footprint: Curbless showers require a recessed drain assembly and a properly sloped pan. In older Boulder City houses with a raised wood subfloor, that means cutting and reframing a section. That’s a tile job, a plumbing job and a structural job, all in one. Plan for 3 – 5 days rather than 1 – 2.
- Fixtures are 15+ years old and every one of them has started to fail in sequence: Faucets drip. The shower valve cartridge can’t be sourced. The toilet runs. The lighting trim is brittle. When a Boulder City homeowner is calling about each fixture one at a time over two months, it’s a coordinated replacement job by the third call.
- You’re prepping a house for sale and the bathroom needs to pass inspection without triggering a full remodel: Vanity hardware, faucets, mirror, towel bars and floor tile can often be brought up to date without touching the walls or shower. That’s a weekend job if the substrate underneath is sound. It’s a full job if it isn’t, and the buyer will find out.
Our Vanities, Tile & Fixtures Process
Every project starts with a free project estimate and design consult, and every project follows the same five steps. Boulder City jobs are quoted the same way as every other market we serve. We look at the space, we scan the substrate for signs of trouble, and we put the number in writing before any saw hits the tile.
- On-site assessment and moisture check. We measure the vanity footprint, check the substrate for deflection, probe the shutoff valves and check the drain assembly. In Boulder City homes that were built before 1980, this is where we find most of the surprises, and we find them before demo rather than after.
- Material and fixture selection. We walk through vanity options (stock, semi-custom, custom), stone and quartz tops, tile format, and fixture brands. You choose based on how it looks and how it holds up, with the material trade-offs made plain before you’re committed to a line item.
- Demo and substrate repair. Old vanity out, old tile up, damaged substrate replaced with cement board or a waterproof membrane system. This step is where the quality of the job is determined. It’s also where we take the most photos, and where we send you the images if anything unexpected comes up.
- Tile layout and installation. Layout is decided before the first tile is set. That includes the cut at the door threshold, the alignment of floor and wall tile, and the niche and flange details around the shower valve. Wrong-thickness tile at the transition is the most common visual mistake we see in Boulder City flips. We don’t make it.
- Vanity set and fixture trim. Vanity cabinet set, top installed, plumbing connected, fixture trim finishes, mirror, hardware and lighting trim installed. We test every valve, every drain, every light and the toilet in front of you before we call the job done.
- Walkthrough and cleanup. Final walkthrough with you, cleanup complete, and all documentation handed over. The work is covered by the 730-Day Done Right Promise: if something we installed fails within that window, we come back and make it right.
We only use background-checked, uniformed technicians on every project. That’s not a sales line. In Boulder City, where a lot of our work happens in occupied homes, we think it’s the right baseline.

Vanities, Tile & Fixtures Pricing in Boulder City
Pricing depends on three variables: the size of the bathroom, the condition of the substrate, and the material tier you choose. The ranges below reflect what these projects cost in the Boulder City market, not national averages. A full bathroom remodel is a separate scope with its own pricing, covered on our Bathroom Remodeling page.
| Work item | Typical range | Notes |
|---|---|---|
| Vanity replacement only (stock cabinet, quartz top, existing floor and walls) | $1,400 – $2,800 | Includes removal, haul-away, plumbing reconnect, hardware |
| Tile floor only (5×8 bathroom, porcelain, existing substrate sound) | $1,600 – $2,900 | Substrate repair or membrane adds $400 – $1,100 if required |
| Tile and vanity combined (typical Boulder City job) | $4,800 – $9,400 | Most jobs completed in 3 – 5 working days |
| Fixture replacement bundle (faucet, shower valve, drain, toilet, mirror, hardware) | $1,200 – $3,400 | Shower valve assembly requires access to the wall; add $300 – $800 if the wall is tiled |
| Full bathroom vanity, tile and fixtures (larger bathroom, older home) | $8,000 – $14,000 | Includes substrate repair, waterproofing and plumbing rough-in adjustments |
What moves the number: Tile can run $2 to $18 per square foot depending on whether you’re using ceramic, porcelain or stone. A double-sink vanity needs more plumbing and more top. A tile shower wall with a niche and a bench adds labor and materials. Substrate damage: if we find rot under the floor, that’s additional framing. If we find a cast-iron drain or a non-standard P-trap under the floor, that’s a plumbing allowance.
We give upfront pricing, which means the price you see is the price you pay. If we find something under the tile that requires a scope change, you hear about it before we make the change. No-hassle pricing works both ways. We offer 0% financing for 18 months and $1,000 off projects over $10,000 for homeowners who want to bring the timeline up. The free estimate and design consult is just that: free.
What brand partners do you use for Boulder City bathroom fixtures?
The brand partners we use most often include master brands across plumbing and tile: Kohler for faucets and toilets, Cambria for quartz vanity tops, and KraftMaid for cabinet lines. A vanity built from KraftMaid cabinets and a Cambria top is one of the most cost-effective upgrades in a Boulder City bathroom, because the quality is in the joints and the surface, not the paint finish. We source tile through standard commercial tile lines rather than designer boutiques; the difference in price is often 40%. If you already have a tile in mind, we’ll quote against it.
How long does a vanity-and-tile project take in Boulder City?
Most combined vanity-and-tile projects in Boulder City run 3 to 5 working days once materials are on-site. A pure fixture swap is 1 day. A large bathroom with a curbless shower and substrate reframing can run 7 to 10 days. Material lead times are the other variable: stock vanities can be available in days, and semi-custom cabinets are typically 3 to 5 weeks. We tell you the lead time in the estimate, not after it’s ordered.
Why does tile fail early in Boulder City homes?
Boulder City’s low average humidity and high summer temperatures cause wood framing and cement products to expand and contract more than in coastal climates. Grout is the first to crack. The more serious issue is that our water has high mineral content; it interacts with soap and water in a shower to form a scale that etches porous stone and discolors grout lines. A properly sealed porcelain tile with a cementitious grout and a waterproof membrane behind it holds up; a builder-grade installation without those steps will start to look shabby in 5 to 7 years, not 15.
FAQs – Vanities, Tile & Fixtures
Can you replace just the vanity without touching the tile?
Yes, if the vanity footprint doesn’t change. A same-size vanity swap with new faucets and shutoff valves is a 1-day job and costs $1,400 – $2,800 in Boulder City. If the new vanity is a different footprint, the floor tile underneath will be exposed and will usually show a color or pattern difference that isn’t worth keeping. In that case, tiling the full floor is the cleaner option. We’ll tell you which path makes sense on the estimate visit. Call (888) 282-1693 for a free estimate.
How much does bathroom tile installation cost in Boulder City?
Tile floor installation in a standard 5×8 Boulder City bathroom runs $1,600 – $2,900 for a porcelain tile floor with sound substrate. That includes removal of old tile, substrate prep, thinset, grout and sealing. It does not include substrate replacement if we find rot, or plumbing relocation if the toilet or vanity are moving, and those add $400 – $1,100 and $300 – $800 respectively. Call (888) 282-1693 for a free estimate.
Can you come today for a vanity, tile or fixture issue?
For active leaks under a vanity, a broken shutoff valve or a failed shower valve, yes, we prioritize same-day assessment requests in Boulder City whenever we can fit them. Non-emergency estimates are typically scheduled within 2 to 3 business days. Calls are answered by a live person 24/7, so if it’s late and the vanity is leaking, you can still reach us. Call (888) 282-1693.
Is it cheaper to repair or replace a bathroom vanity in Boulder City?
Repair is cheaper if the cabinet frame is solid and the issue is a single drawer, a door front or a worn top. A cabinet-front or top replacement typically runs $400 – $1,200 versus $1,400 – $2,800 for a full vanity swap. If the cabinet base is soft from water damage, replacement is the only durable fix; repairs over a compromised cabinet don’t last. We’ll tell you which one your situation calls for. Call (888) 282-1693 for a free estimate.
If your Boulder City bathroom needs a new vanity, new tile or a fixture set that’s overdue for replacement, the fastest way to a real number is a call. We answer live, 24/7, at (888) 282-1693. Every estimate is free, every project is covered by the 730-Day Done Right Promise, and every job is done by background-checked, uniformed technicians with up to 12 years of experience. For the full context of what a Boulder City bathroom can become, start with our home page and the bathroom remodel guide linked above.
Written by the team at Groundwork Construction Co. of Boulder City, serving Boulder City.


