







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Spring Valley, NV: What the Job Really Involves
Cabinets & countertops in Spring Valley typically run $14,000 – $45,000 for a full tear-out and replacement, and most homes are back to a working kitchen in three to five weeks. The job is two linked installations: new cabinet boxes and fronts set level and plumb first, then a templated stone or quartz top cut to fit the cabinets as they actually sit. Call (888) 282-1693 and we’ll walk your kitchen, measure, and put a written line-item number in front of you.
How the work actually goes, stage by stage

Kitchens don’t get built in a day, and anyone who says otherwise hasn’t done one. Here’s the real sequence we run in Spring Valley homes, with the decisions you’ll make at each step.
Stage 1: Measure, template, and lock the order (week 1)
We take field measurements of the room, note where the range, sink, and refrigerator land, and check that the walls are square enough for standard boxes. You choose door style, finish, and box construction, then we place the cabinet order. The countertop template usually waits until the cabinets are set, because a laser template taken against installed boxes is the only way to guarantee a tight seam. Expect a deposit and a firm lead time before anything ships.
Stage 2: Demo and prep (days 1 – 2)
Old cabinets, tops, and the sink come out. We shut off and cap the water, pull the old disconnect for the range, and inspect the wall behind the cabinets for water staining or soft drywall. In 1990s-era Spring Valley homes we sometimes find a membrane or a shutoff valve that needs replacing while the wall is open. You decide then whether to add an outlet or move the gas line; changing your mind later costs more.
Stage 3: Set the cabinets (days 2 – 4)
Base and wall boxes go in level and shimmed to the wall, screwed into studs, and crowned with filler panels so the run reads clean. We hang doors and drawers, set the hardware, and install the toe kick. This is where a cheap install shows: a run that’s out of level by a quarter inch telegraphs straight through the countertop seam. You confirm hardware placement and any pull-out inserts before we lock it down.
Stage 4: Template and fabricate the top (days 4 – 10)
A fabricator lasers the installed cabinets and cuts the slab. Quartz and granite both need a sink cutout and polished edges, which happen off site. This is the longest single wait in the job, and it’s the stage homeowners underestimate. You pick the edge profile and confirm the sink and faucet so the cutout matches.
Stage 5: Install, set the sink, and final walk (days 10 – 14)
The top goes down on a bead of adhesive, seams get color-matched epoxy, and the undermount sink is bracketed underneath. We connect the faucet and disposal, run water, and check for drips. Then we walk the room with you, adjust hinges and drawer glides, and hand over the paperwork. Most Spring Valley jobs land in that three-to-five-week window, with the countertop wait as the wildcard.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually make
Two homeowners can spend $14,000 and $45,000 on the same footprint. The gap lives in these decisions.
- Cabinet box construction: plywood boxes outlast particleboard in a dry desert climate, where seasonal humidity swings are mild but heat is constant. Plywood runs more; it’s the right call if you plan to stay put.
- Door style and finish: painted shaker and slab fronts cost less than a glazed or hand-finished custom door. Paint hides minor wear better than a dark stain, which shows every scuff.
- Countertop material: quartz is non-porous and needs no sealing; granite is natural and needs resealing every year or two. Both handle Las Vegas valley heat indoors without trouble. Laminate is the budget floor; butcher block is warm but wants oiling.
- Sink and faucet configuration: a single-bowl undermount with a pull-down faucet is the practical default. Farmhouse sinks need a modified cabinet, which adds cost and lead time.
- Storage inserts: pull-out trash, drawer dividers, and lazy Susans are small line items that add up. Decide before the order ships, not after.
We work with KraftMaid and Cambria among others, so you can compare a real door sample against a real slab instead of picking from a photo.
What Cabinets & Countertops costs in Spring Valley, NV

Plan on $14,000 – $45,000 for the full job. Cabinet installation alone runs $4,000 – $13,000, countertop installation $2,000 – $6,500, and a kitchen island $3,000 – $10,000 if you’re adding one. What pushes a number toward the top of that range:
- Size and layout: a galley kitchen and a 20-foot run with an island live in different zip codes on the invoice.
- Existing condition: water damage, out-of-square walls, or a floor that needs leveling adds labor before a single box goes in.
- Relocating plumbing or electrical: moving the sink or range means new supply, drain, and circuit work, which is a real line item.
- Material grade: quartz with a dramatic vein pattern costs more than a solid color; a custom door costs more than a stock one.
- Permit scope: a straight swap is one thing; moving walls or gas lines triggers a larger permit and inspection sequence.
Our written estimate lists cabinets, top, labor, demo, and haul-away line by line. It doesn’t cover appliance purchases, and it won’t include a surprise change order later. That price holds, backed by our 730-Day Done Right Promise. Things that typically land outside the number: new appliances, flooring, and any electrical the code inspector flags once the wall is open.
See the difference
Before
After
Before
After
Before
AfterWhat Spring Valley homes specifically do to this job
Spring Valley is unincorporated Clark County, so every permit for this work runs through the county’s Department of Building & Fire Prevention, not a city hall. That matters because the county reviews the scope, and a cabinet-and-counter swap with no plumbing or structural changes often permits quickly while a layout change needs a longer review. Along South Durango and the 215 Beltway corridor in 89113, the housing stock splits between 1990s – 2000s stucco-and-tile tract homes inside gated subdivisions and newer custom builds. In the gated communities, the HOA usually wants a work-hours schedule and sometimes a dumpster placement approval before demo day; we handle that paperwork. The tract homes built to modern county code rarely need structural retrofits, which keeps this job focused on finish and fit.
The desert heat shapes the schedule too: summer highs hit 105 – 110°F, so cabinet deliveries and any outdoor cutting happen early, and we keep the house closed and cooled so wood and quartz don’t take on moisture swings. If your job is part of a full Kitchen Remodeling in Spring Valley, the cabinet-and-top phase slots into that larger schedule. Homeowners here often pair this with a Garage Conversion ADU in Spring Valley and want the finishes to match, or with a New Detached ADU in Spring Valley where a second kitchen needs the same treatment. We cover all of Spring Valley and the surrounding valley, and you can see our broader Kitchen Remodeling service for the full scope.
Serving Spring Valley, NV – Our Local Coverage Area
We serve Spring Valley and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Cabinets & Countertops in Spring Valley

Most jobs run three to five weeks from demo to final walk, and the countertop fabrication wait is the biggest variable. Cabinet lead time can stretch the front end if you pick a custom door, so the sooner the order goes in, the sooner the kitchen comes back. Call (888) 282-1693 for a schedule tied to your actual selections.
A straight swap of cabinets and tops with no plumbing, gas, or wall changes usually needs no permit, but any relocation of a sink, range, or wall does. Because permitting runs through Clark County rather than a city office, we confirm the scope before work starts and pull what’s required. Call us and we’ll tell you which side your job falls on.
Yes, and most Spring Valley jobs keep the existing sink and range locations to hold cost down. Reusing the plumbing keeps the price near the low end of $14,000 and skips the inspection sequence. If you want to move the sink under a window or add an island, that’s a different scope and we’ll price it separately.
The full job lands between $14,000 and $45,000 depending on size, material grade, and whether plumbing or electrical moves. Cabinet installation runs $4,000 – $13,000 and countertops $2,000 – $6,500 as standalone line items. Call (888) 282-1693 for an exact quote, and estimates are free.
Every cabinets and countertops job is covered by our 730-Day Done Right Promise: if it isn’t done right, we make it right. That covers our workmanship on installation, and manufacturer warranties cover the cabinets and stone separately. You get it in writing before we start.
Get a free estimate for Cabinets & Countertops in Spring Valley
Call (888) 282-1693 to set up a free on-site estimate. We’ll measure the kitchen, talk through cabinet and countertop options, and hand you a written line-item price with no surprises. A live person answers around the clock, so you’re never stuck in a voicemail. Free design consult, 0% financing for 18 months, and $1,000 off projects over $10,000.
Written by the team at Groundwork Construction Co.












