Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Boulder City, NV: What the Job Actually Involves
New cabinets and countertops in Boulder City usually run $4,000 – $13,000 for cabinet installation and $2,000 – $6,500 for countertops, with most full cabinet-and-counter projects landing between $14,000 and $45,000 when the layout, island, and backsplash are part of the scope. A straightforward cabinet swap with new counters takes 2 – 3 weeks of working time; a job that reworks the layout or opens a wall runs 4 – 6 weeks. The Boulder City housing stock shapes that number more than any other factor, which is why we walk the kitchen before quoting it. Call (888) 282-1693 for a free on-site estimate.
How a cabinet and countertop job moves, day by day

Most contractors describe this work as “demo, install, done.” Here’s the sequence we actually run, and where you make decisions along the way.
- Day 1-2: Site check and protection. We confirm wall and floor condition, shut off water to the sink, and photograph anything hidden that matters later. In Boulder City’s older bungalows this is where we find out whether the wall behind the cabinets is plaster over lath, unreinforced brick, or stucco-over-frame, because each one changes how cabinets get anchored. You decide nothing yet; you get a written report of what we found.
- Day 2-4: Demo and prep. Old cabinets and counters come out, and any damaged drywall, subfloor, or backing gets repaired. If the layout is changing, this is when plumbing rough-in and electrical relocation happen, and if a permit is involved, this is the stage that gets inspected. You decide at the walkthrough whether to keep or relocate the sink and range.
- Day 5-8: Cabinet install. Uppers go in first, then bases, then the island frame. We shim and level to the floor, not just to the wall, because pier-and-beam floors here are rarely flat. You confirm door and drawer placement on day one of this stage, before anything is screwed down.
- Day 9-11: Countertop template and fabrication. Stone and quartz counters are templated after cabinets are set, then fabricated off-site, which is the 5-10 day gap most homeowners don’t expect. Laminate and butcher block can be cut on-site and installed within a day. You decide the edge profile and overhang before templating.
- Day 12-15: Sink, faucet, backsplash, and punch list. Plumbing reconnects, the backsplash goes up, and we walk the kitchen with you. Final decisions land here: hardware, caulk line, and whether the toe kick matches the cabinet or the floor.
If your project sits inside a Kitchen Remodeling in Boulder City scope that also touches flooring or lighting, the sequence overlaps instead of stacking, which is why we plan cabinets and counters as one job rather than two.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that actually change your kitchen
Cabinet and countertop selection isn’t a style exercise. Each material carries a real trade-off in cost, upkeep, and how it behaves in a desert kitchen.
- Stock cabinets (KraftMaid and similar lines) arrive in fixed sizes and ship fastest, usually 2-4 weeks. They suit standard layouts and tighter budgets, but you lose exact wall-to-wall fit and filler strips show.
- Semi-custom cabinets let you adjust depth, height, and drawer configuration, add 20-30% to the cabinet line, and add 4-6 weeks to the schedule. This is the sweet spot for most Boulder City kitchens because ceiling heights and wall runs in older homes are rarely standard.
- Custom cabinetry is built to the inch, costs the most, and takes 8-12 weeks. Worth it in a historic-district home where nothing is square and you need inset doors to match the period.
- Quartz countertops are non-porous, need no sealing, and hold up to the dry heat with no maintenance beyond a wipe. Expect $60-$95 per square foot installed.
- Granite runs similar to slightly less, brings natural variation, and needs resealing every year or two. In a low-humidity climate it’s stable, but dark slabs get hot under direct window sun.
- Laminate costs a fraction of stone and is the honest answer when the budget is tight. It won’t survive a hot pan and seams show, but it’s a legitimate 10-15 year surface if you plan to upgrade later.
- Butcher block and solid surface split the difference on cost and warmth, but wood needs oiling and solid surface can scorch.
We typically pair KraftMaid cabinetry with a Cambria or quartz counter in mid-range kitchens, and we’ll tell you plainly when a stock line is the smarter spend. The 730-Day Done Right Promise covers the install either way, and if it’s not done right, we make it right.
What cabinets and countertops cost in Boulder City, NV

Here’s the line-item breakdown we use for a Boulder City kitchen, and the numbers move for five reasons: kitchen size, wall and floor condition, layout changes, material grade, and permit scope.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash | $800 – $2,500 |
| Kitchen island | $3,000 – $10,000 |
| Full cabinet + counter project | $14,000 – $45,000 |
Low end: stock cabinets, laminate counters, no layout changes, walls in reasonable shape, no permit. High end: semi-custom or custom cabinetry, stone counters, an island, relocated plumbing or electrical, and plaster-and-lath repair behind the old cabinets. A structural change or a wall removal pushes you toward the top of the range fast, because that scope moves into Kitchen Remodeling territory.
A written estimate covers cabinet and counter material, labor, delivery, demo, haul-away, and the install itself. It typically doesn’t cover hidden wall or floor damage found after demo, plumbing or electrical relocation, or a permit fee if the scope requires one. We document anything hidden before work starts so the number you see is the number you pay, and calls are answered by a live person around the clock.
See the difference
Before
After
Before
After
Before
AfterWhat Boulder City homes do to a cabinet job
Boulder City is a federally chartered 1931 company town built by the Bureau of Reclamation to house Hoover Dam workers, and most of the original bungalows and modest 1930s-40s cottages sit near the historic district. That matters for cabinets and countertops in a way it doesn’t in Henderson, because Depression-era construction methods show up the moment you pull the old cabinets: unreinforced brick, pier-and-beam foundations, and knob-and-tube-era wiring often sit right behind the wall. A simple cabinet swap becomes a preservation-sensitive project, and the historic-preservation review here is unusually rigorous. In the historic core, even a window or exterior change can trigger review under Boulder City’s preservation ordinances, and a contractor who shows up with a standard off-the-shelf quote for a 1930s cottage may be told to match the original profile.
The dry Mojave air and expansive desert soils add their own wrinkle. Shrink-swell movement cracks slabs and throws floors out of level, so cabinets get shimmed and leveled to the floor, not just the wall, or the doors will swing and the counter seams will show. Summer highs of 100-110°F mean stone fabrication and any concrete work get scheduled for early morning. For newer infill east of the historic district, jobs run more like standard remodels, though 1950s-70s tract homes still hide their share of surprises. We cover the whole town, and if your project grows into something larger you may find yourself pairing it with a Garage Conversion ADU in Boulder City or a New Detached ADU in Boulder City so the new kitchen serves more than one household.
Serving Boulder City, NV – Our Local Coverage Area
We serve Boulder City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: Cabinets & Countertops in Boulder City

A straightforward cabinet and counter swap takes 2-3 weeks of working time. Stone counters add a 5-10 day fabrication gap after templating, and a layout change or structural repair can stretch the job to 4-6 weeks. We schedule around the historic-preservation review when it applies, and we tell you the real dates up front.
Cosmetic cabinet and counter replacement usually doesn’t require a permit, but any plumbing, electrical, or structural change does. In Boulder City’s historic district, exterior alterations and additions can trigger preservation review even when the interior work is minor. We pull the permits that apply and pass the inspections. Call (888) 282-1693 to confirm your specific scope.
Yes, and that’s the most common way we do it. Keeping the sink and range in place avoids plumbing and electrical relocation and keeps the job at the low end of the $14,000-$45,000 range. You lose the freedom to reconfigure the layout, but you keep the budget and the timeline.
Cabinet installation runs $4,000-$13,000, countertops $2,000-$6,500, and a full cabinet-and-counter project lands between $14,000 and $45,000. Size, wall condition, layout changes, material grade, and permit scope set where you fall. Call (888) 282-1693 for an exact quote; estimates are free.
Every cabinet and countertop install is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If something isn’t right, we come back and make it right, and we put that in writing before work starts.
Get a free cabinets and countertops estimate in Boulder City
Call (888) 282-1693 and a live person picks up, day or night. We’ll set a free on-site estimate, walk your kitchen, and hand you a written line-item quote for cabinets and countertops with no surprises. Our technicians have up to 12 years of experience, they arrive background-checked and in uniform, and the 730-Day Done Right Promise backs the install. Projects over $10,000 qualify for $1,000 off, and 0% financing for 18 months is available. We cover Boulder City kitchen by kitchen.
Written by the team at Groundwork Construction Co. of Boulder City.