A Groundwork company - serving Boulder City, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Henderson, NV

Garage Conversion ADU in Henderson - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Boulder City
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A new front yard fence with a matching gate
A new paver pool deck
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Henderson, NV: What It Costs and How Long It Takes

A garage conversion ADU in Henderson runs $45,000 – $130,000 and takes roughly 3 to 5 months from permits to final inspection. Most of that money goes into the things you can’t see once the walls go back up: a raised, insulated floor over the slab, new electrical service, HVAC, plumbing for a kitchenette or bath, and windows pulled from the existing garage wall. Call (888) 282-1693 and we’ll walk your specific garage and give you a written, line-item estimate before anyone touches a tool.

Call (888) 282-1693

How a garage conversion actually gets built here, stage by stage

A remodeled family room with new windows and a window seat

This isn’t a weekend flip job, and the sequence matters more than the finishes. Here’s the real order of events.

Stages 1 to 2: design, engineering, and permits (4 to 8 weeks). We measure the garage, confirm ceiling height and how the existing slab sits, and get the drawings done. Because so many Henderson garages sit on post-tension slabs, we scan or x-ray the floor before any cutting is even proposed. You decide the layout at this stage: studio versus one-bedroom, where the bath lands, whether you want a kitchenette. Nothing gets built until the city signs off.

Stage 3: demo and rough-in (2 to 3 weeks). Out comes the garage door and opener, any shelving, and whatever the previous owner bolted down. The new raised floor goes in over the slab with a vapor barrier, which keeps the finished floor from pulling desert-ground moisture. Then electrical rough-in, plumbing if there’s a bath, and HVAC. You’ll pick fixture locations and confirm outlet placement around now.

Stage 4: framing, insulation, drywall, and the envelope (3 to 4 weeks). The old garage door opening gets framed and closed with a window or a solid wall. In Henderson, insulation is the whole ballgame in August, so we spec it for the heat, not for a mild climate. Stucco patching goes outside to match the house.

Stage 5: finishes and final inspection (3 to 4 weeks). Flooring, paint, trim, bath tile, fixtures, and the final walkthrough with the inspector. You’ll make your last calls here on paint color and flooring material. This is also when the smoke and CO detectors, egress windows, and any separation requirements get signed off.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll actually make, and what each one costs you

A garage conversion is a stack of decisions, and a few of them swing the budget more than the rest.

  • Raised floor versus slab-on-grade. A framed floor over the existing slab keeps the unit warmer in winter and gives you a place to run plumbing and electrical without trenching. It costs more up front and eats 4 to 6 inches of headroom. Pouring a new finished slab is cheaper but locks your plumbing routes to wherever you can trench.
  • Full bath versus half bath versus kitchenette. A full bath with a walk-in shower is the single biggest cost driver. Delta and American Standard fixtures land in the middle of the range and hold up; Toto sits at the high end for a reason. A half bath or a sink-and-fridge kitchenette cuts the plumbing work roughly in half.
  • Egress and windows. A bedroom needs a properly sized egress window, which means cutting the existing garage wall and framing it. That’s a real line item, not a trim detail.
  • Separate HVAC versus tying into the house. A dedicated mini-split gives the tenant their own thermostat and keeps you from overloading the main system. Tying in is cheaper but only works if the existing unit has capacity to spare.
  • Finishes. Luxury vinyl plank handles desert humidity swings and rental wear without drama. Tile in the bath, with a proper waterproofing membrane like Schluter behind it, is the choice that keeps a shower from leaking into the framing a few years in.

What a Garage Conversion ADU costs in Henderson, NV

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for a garage conversion ADU in Henderson, with most projects landing in the $60,000 – $90,000 band. The low end is a studio with a half bath and a mini-split. The high end is a full one-bedroom with a kitchenette, a full bath, upgraded finishes, and a garage door opening rebuilt into a window wall.

Here’s what pushes a job toward the top of that range:

  • Plumbing distance. The farther the new bath sits from the house’s existing drain lines, the more concrete and trenching you’re paying for.
  • Electrical service. Older panels near downtown may need an upgrade to carry a separate unit. That’s a permit-scope cost, not a materials cost.
  • Slab condition and cable location. Post-tension cables in the wrong spot mean engineering, scanning, and careful rerouting.
  • Ceiling height. A raised floor helps the unit but only if there’s headroom to spare.
  • Finish grade. Standard LVP and builder fixtures versus tile floors, a tiled shower, and premium plumbing fixtures.

A written estimate from us lists every one of those lines separately, with the permit fees and the inspection schedule spelled out. What it won’t include, and what we tell you up front: furniture, appliances you buy yourself, and any landscaping or driveway work around the unit. That last category is where homeowners often pair this with Concrete Driveways & Concrete Work in Henderson, since losing the garage means rethinking where cars actually park.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Henderson homes specifically do to this job

Henderson was built on engineered ground, and that shapes this work more than anything else. Nearly every subdivision here was graded over caliche-hard desert soil and, in places, former gypsum and borax mining ground. That means foundations, retaining walls, and slab conditions get real scrutiny, not a glance. In Green Valley, Anthem, and Seven Hills, the housing stock is overwhelmingly 1990s and 2000s tract construction, much of it on post-tension slabs, so any conversion that has to cut the floor gets scanned or x-rayed for tensioned cables first. Cables can’t be cut without an engineer signing off, and it’s a permit reality specific to Southern Nevada.

The heat matters too. With summer highs routinely over 110°F, insulation and HVAC sizing aren’t optional upgrades, and stucco patch work cures differently here than in wet climates. Monsoon season down the McCullough Range foothills is the other half of the story, which is why we care about how the converted unit sheds water away from the house. If the project grows into something larger, it’s really part of a full Home Additions & ADU in Henderson scope, and we handle that too. We cover all of Henderson, including the 89002, 89052, 89009, and 89016 ZIP codes.

Serving Henderson, NV – Our Local Coverage Area

We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked questions about a Garage Conversion ADU in Henderson

A stone counter, tile backsplash and open shelf after a kitchen remodel

Get a free estimate on your Garage Conversion ADU

Call (888) 282-1693 and we’ll schedule a free on-site estimate at your Henderson home. You’ll get a written, line-item quote with permits, inspection milestones, and finish allowances spelled out, so the number you see is the number you pay. If the project grows past the garage, our Home Additions & ADU team can carry it from foundation to finish line. Homeowners often pair the work with Asphalt Driveways & Resurfacing in Henderson once the cars need a new home.

Written by the team at Groundwork Construction Co.

Why Henderson Chooses Groundwork Construction Co. of Boulder City

We set the standard for garage conversion ADU in Henderson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Henderson

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Henderson Customers Say

Trusted by homeowners across Henderson and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver border

More services in Henderson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Boulder City

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Boulder City team

A local vetted partner works across Boulder City and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Henderson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Henderson.

(888) 282-1693

Request a Free Estimate in Henderson

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch