A Groundwork company - serving Boulder City, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Summerlin, NV

Garage Conversion ADU in Summerlin - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Boulder City
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Summerlin: What the Job Actually Involves

A garage conversion ADU in Summerlin turns an attached garage into a permitted, rentable or family-ready living unit, and most projects land between $45,000 and $130,000 depending on how much plumbing, structural work, and finish grade you choose. A typical conversion runs 3 to 5 months from demo to final inspection. Call (888) 282-1693 and we’ll walk your garage and give you a real number, not a range over the phone.

Call (888) 282-1693

A finished backyard cottage with a small covered porch

Every conversion follows a sequence because the order protects your budget. Skip a step and you’ll tear out finished work later.

  • Stage 1 – Walkthrough and design (1 – 2 weeks). We measure the slab, check ceiling height against code, and locate the gas water heater or furnace many Summerlin garages hide in a closet. You decide the layout and whether the unit gets its own exterior entry. This is also when we flag HOA design review, which matters in the gated villages off Hualapai Way.
  • Stage 2 – Permits and engineering (3 – 6 weeks). Plans go to the jurisdiction for a dwelling-unit conversion. Structural calcs are needed if we’re cutting the slab for a bathroom drain or adding a header where the garage door was. You sign off on the plan set; we handle submittal and corrections.
  • Stage 3 – Demo and rough-in (2 – 3 weeks). Out comes the garage door, the opener, and any shelving or finished surfaces. Then framing for the new wall and door openings, plumbing for the kitchenette and bath, electrical for the panel, HVAC, and insulation. The rough inspection happens here, before a single square foot of drywall goes up.
  • Stage 4 – Close-up and finishes (4 – 7 weeks). Drywall, texture, paint, flooring, cabinetry, fixtures, and the new exterior skin where the garage door used to be. This is your longest decision window: flooring and cabinet choices need to be locked before this stage or the schedule slips.
  • Stage 5 – Final inspection and punch (1 – 2 weeks). Final inspection, then a walkthrough with you. Anything on the punch list gets fixed before we call the job done, and it stays covered under the 730-Day Done Right Promise.

We keep the same order every time because the failure we see most often is a homeowner who picks finishes before engineering is done, then pays to redo them. Get the structural answers first, choose finishes last. Home Additions & ADU work runs on the same discipline, and a garage conversion is simply the tightest, most budget-friendly version of it.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Summerlin Garage Conversion ADU

  • Flooring. Polished or stained concrete keeps the existing slab, costs the least, and handles Summerlin’s dry heat without gapping. Luxury vinyl plank is warmer underfoot and hides slab imperfections. Tile in the wet bath is non-negotiable for resale. The trade-off is price versus comfort; polished concrete saves you thousands but reads industrial.
  • Exterior facade where the garage door was. You can stucco it to match the house or install a window and a standard entry door. Stucco matching is a real skill here because Summerlin’s stock is stucco-clad and the older villages in The Trails have original 1990s finishes that have weathered to a different tone than fresh material. A good patch matches; a cheap one is visible from the street.
  • Kitchenette versus full kitchen. A sink, fridge, and microwave cost far less and often dodge extra plumbing and venting. A full range means a dedicated circuit, hood venting to the exterior, and a bigger permit scope. Decide based on whether you’re renting long-term or housing family.
  • HVAC. Extending the house system is cheapest when there’s capacity. A dedicated mini-split handles a garage conversion well and lets the tenant control their own comfort, at a higher up-front cost. In Summerlin’s extreme summer heat, undersizing this is the mistake we see most.
  • Windows and doors. This is where wind rating enters the conversation. Impact-rated glazing and a rated exterior door cost more but suit the desert’s wind-scoured storms, and we’ll walk you through what the local code expects for your specific location before you buy.

What a Garage Conversion ADU Costs in Summerlin, NV

A framer checking new wall framing on a home addition

Plan on $45,000 to $130,000. A bare-bones studio with a half bath and polished concrete can land near the bottom. A one-bedroom unit with a full kitchen, dedicated HVAC, and premium finishes pushes toward the top.

Four things move that number:

  1. Bathroom and kitchen plumbing. Tying into the main drain is simple when the garage sits near the house’s wet wall and expensive when it doesn’t. Cutting a slab for new drain lines adds cost, and the farther the run, the higher it climbs.
  2. Structural work. Removing the garage door and adding a proper header, or adding a second entry, means engineering and steel or engineered lumber. A straight conversion with no structural change stays cheap.
  3. HVAC and electrical. A panel upgrade to carry the new unit’s load is sometimes required. A dedicated mini-split versus an extension of the existing system can swing thousands.
  4. Finish grade. Flooring, cabinetry, and fixture choices are where a conversion flexes from modest rental to high-end in-law suite.

A written line-item estimate covers demo, rough-in, insulation, drywall, finishes, and the permit pull. What it typically doesn’t cover: HOA design-review fees, any unexpected slab or foundation repair, and landscaping where the driveway used to meet the house. We list those separately so there are no change-order surprises. Upfront pricing, itemized and signed, is how we work. Home Additions & ADU in Summerlin lays out the wider project scope if you’re weighing a conversion against a bump-out.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Summerlin Homes Specifically Do to This Job

Summerlin’s housing stock runs overwhelmingly toward stucco-clad, tile-roofed single-family homes built from the 1990s through the 2020s, and that shapes a garage conversion in ways a generic page won’t tell you. The older villages like The Trails have original stucco that has hairline-cracked from decades of thermal cycling, so patching where the garage door was takes a careful mix match, not an off-the-shelf bag. The newer northwest subdivisions sit over caliche that can stop a trenching shovel cold, which means any plumbing run under the slab or out to a new drain line can turn a simple job into a slower, costlier one block to block. Then there’s the HOA. Most Summerlin communities enforce design review, and where the converted facade faces the street you’ll need approval before we stucco. Add monsoon-season drainage planning so the new exterior entry doesn’t channel water toward the slab, and you can see why local fluency matters here. Call (888) 282-1693 and we’ll tell you which of these applies to your street. We work all of Summerlin, and homeowners often pair a conversion with a freshened approach, like Asphalt Driveways & Resurfacing in Summerlin or Concrete Driveways & Concrete Work in Summerlin, once the old garage parking is gone.

Serving Summerlin, NV – Our Local Coverage Area

We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Summerlin

A new curved paver walkway to the front porch

Get a Free Estimate on Your Summerlin Garage Conversion ADU

Call (888) 282-1693 to schedule a free on-site estimate for your garage conversion ADU in Summerlin. A live person answers around the clock. On the visit we measure the garage, check the slab and ceiling height, and flag any structural, plumbing, or HOA issue that will affect cost. You get a written, itemized number with no surprises, and $1,000 off projects over $10,000 with 0% financing for 18 months available.

Written by the team at Groundwork Construction Co.

Why Summerlin Chooses Groundwork Construction Co. of Boulder City

We set the standard for garage conversion ADU in Summerlin.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Summerlin

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Summerlin Customers Say

Trusted by homeowners across Summerlin and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new black aluminum pool fence with a gateA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gate

More services in Summerlin

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Boulder City

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Boulder City team

A local vetted partner works across Boulder City and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Summerlin?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Summerlin.

(888) 282-1693

Request a Free Estimate in Summerlin

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch