A Groundwork company - serving Boulder City, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Boulder City, NV

Garage Conversion ADU in Boulder City - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Boulder City
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Boulder City: What It Takes and What It Costs

A garage conversion ADU in Boulder City turns an attached or detached garage into a legal dwelling unit, and it usually runs $45,000 – $130,000 depending on how much plumbing, electrical and structure the build touches. Most jobs take 10 to 16 weeks from permit to final walkthrough. Call (888) 282-1693 and we’ll walk your garage, check the foundation and wiring, and put a line-item number in writing before you commit to anything.

Call (888) 282-1693

How a Garage Conversion ADU Comes Together, Stage by Stage

A garage converted into a guest room and home office

Garages are shells built for cars, not people, and the work follows that reality. Here’s the actual sequence we run on a Boulder City garage conversion ADU, with what you decide at each stop.

Stage 1 – Assessment and design (week 1)

We open the garage up and look at what’s under it. On 1930s Hoover Dam-era properties that means checking whether the slab or pier-and-beam foundation can carry a habitable load, whether the wiring is original knob-and-tube, and whether the walls are unreinforced brick that needs bracing before we cut into it. You decide the layout at this stage: studio versus one bedroom, kitchenette or full kitchen, where the bathroom sits. The bathroom location is the single biggest cost decision on the whole job.

Stage 2 – Permits and historic review (weeks 1 – 3, runs parallel)

We submit to the city and, if your property falls inside the historic district, into preservation review as well. That review can add two to four weeks on its own, and it can dictate exterior details like door and window profiles. You won’t have to chase the paperwork; we handle submittal and respond to plan-check comments. You will need to sign off on any design change the reviewer requests.

Stage 3 – Demo and rough-in (weeks 3 – 6)

Out comes the old garage door, the opener track, any shelving and the existing slab if it’s cracked past saving. Then we frame the new interior walls, run plumbing to the bathroom and kitchenette, pull dedicated electrical circuits, and rough in HVAC or a ductless mini-split. This is the noisiest, messiest stretch. You’ll make your fixture and appliance selections in this window so nothing holds up the next phase.

Stage 4 – Insulation, drywall and finishes (weeks 6 – 12)

Spray foam and batt insulation go in, then drywall, then the finishes: flooring rated for slab-on-grade, cabinets, counters, tile in the bath, paint. Desert heat is unforgiving on a garage-turned-living-space, so the insulation spec and the mini-split sizing matter more here than they would in a main house.

Stage 5 – Inspections and closeout (weeks 12 – 16)

Rough inspections happen before drywall; final inspections happen after finishes. We schedule them, meet the inspector on site and correct anything flagged. Your last walkthrough is where we hand over the signed-off unit and the 730-Day Done Right Promise in writing.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make

Most of the swing between a $45,000 job and a $130,000 job lives in these decisions:

  • Bathroom placement: Putting the bath against an existing exterior wall where drain lines can drop straight out keeps cost down. Trenching a new drain across the slab or tying into a bathroom on the far side of the house is where budgets climb.
  • Kitchenette versus full kitchen: A sink, mini-fridge and counter run is a fraction of the cost of a full kitchen with a range, venting and appliance circuits.
  • Ductless mini-split versus extending the house HVAC: A mini-split is usually cheaper and easier to install, and it suits a converted garage’s odd shape. Extending existing ductwork only makes sense when the main system has capacity to spare.
  • Flooring over slab: Luxury vinyl plank holds up well over desert slabs and won’t crack with minor movement; porcelain tile lasts longer but costs more in labor; carpet is the cheapest and the worst choice for a slab that moves.
  • Window and door grade: Inside the historic district, exterior doors and windows may be required to match original profiles. That’s a real line item, often $3,000 – $8,000 above standard replacement vinyl.
  • Whether you finish the exterior at all: If the garage door opening stays as a garage, you pay for a new door. If you’re converting, you pay to frame, insulate and finish it, then add a matching facade.

What a Garage Conversion ADU Costs in Boulder City, NV

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for a garage conversion ADU in Boulder City. Here’s what moves the number:

  • Garage size and ceiling height: A single-car garage is the low end. A double garage you’re splitting into living space plus a bedroom pushes toward the high end just on square footage.
  • Existing condition: Undersized or knob-and-tube wiring, no insulation, a failing slab, unreinforced brick walls that need structural help. These are the surprises that appear in older Boulder City homes.
  • Plumbing and electrical relocation: The single biggest variable. A bath that sits where drains already exit costs far less than one that requires trenching.
  • Material grade: Builder-grade cabinets and LVP flooring keep you near the bottom of the range; a KraftMaid kitchen and stone counters push toward the top.
  • Permit and historic-review scope: Preservation review adds time and, in some cases, mandated exterior detailing. We always price this separately and in writing.

A written estimate from us covers demo, framing, rough-in trades, insulation, drywall, finishes, permits and inspection coordination. What it typically doesn’t cover is appliances you supply yourself, any structural repair discovered after demo starts, and landscaping once the old driveway apron is gone. The instant homeowners often pair this with Concrete Driveways & Concrete Work in Boulder City is when the old apron gets torn out and needs replacing. No surprise line items, no change orders behind your back; the number we quote is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Boulder City Homes Do to a Garage Conversion

Boulder City is a federally chartered 1931 company town, built by the Bureau of Reclamation to house Hoover Dam workers, and most of the original bungalows and modest cottages sit near the historic district. That history walks straight into this job. We regularly find unreinforced brick walls, pier-and-beam foundations and original knob-and-tube wiring in these homes, which means a garage that looks solid from the driveway can need bracing or rewiring before we close it in. Preservation review is the other reality: a window or door spec that’s routine in Henderson may come back flagged here because it has to match a 1930s divided-light profile. Add Mojave Desert heat with summer highs at 100 – 110°F and expansive soils that shift a slab over time, and the insulation and foundation work on a Boulder City conversion matters more than on the same job in a newer house. Our technicians have up to 12 years of experience and we cover every corner of Boulder City, from the historic core out toward the newer infill east of it. When the wider project scope grows into a full second unit or an attached addition, that’s covered on our Home Additions & ADU in Boulder City page.

Serving Boulder City, NV – Our Local Coverage Area

We serve Boulder City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Boulder City

A walk-in shower with large-format tile and a built-in niche

Get a Free Estimate on Your Boulder City Garage Conversion

If you’re weighing a garage conversion ADU in Boulder City, start with a free on-site estimate. Call (888) 282-1693 and a live person picks up any hour. We’ll look at the foundation, wiring and garage door opening, talk through what the city will require, and hand you a written line-item quote with permits and inspections built in. From foundation to finish line, one contractor, one number, backed in writing.

Written by the team at Groundwork Construction Co.

Why Boulder City Chooses Groundwork Construction Co. of Boulder City

We set the standard for garage conversion ADU in Boulder City.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Boulder City

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Boulder City Customers Say

Trusted by homeowners across Boulder City and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA standing-seam metal roof over a covered porchA new bay window with a cushioned seat

More services in Boulder City

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Boulder City

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Boulder City team

A local vetted partner works across Boulder City and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Boulder City?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Boulder City.

(888) 282-1693

Request a Free Estimate in Boulder City

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch