Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Boulder City: What It Takes and What It Costs
A garage conversion ADU in Boulder City turns an attached or detached garage into a legal dwelling unit, and it usually runs $45,000 – $130,000 depending on how much plumbing, electrical and structure the build touches. Most jobs take 10 to 16 weeks from permit to final walkthrough. Call (888) 282-1693 and we’ll walk your garage, check the foundation and wiring, and put a line-item number in writing before you commit to anything.
How a Garage Conversion ADU Comes Together, Stage by Stage

Garages are shells built for cars, not people, and the work follows that reality. Here’s the actual sequence we run on a Boulder City garage conversion ADU, with what you decide at each stop.
Stage 1 – Assessment and design (week 1)
We open the garage up and look at what’s under it. On 1930s Hoover Dam-era properties that means checking whether the slab or pier-and-beam foundation can carry a habitable load, whether the wiring is original knob-and-tube, and whether the walls are unreinforced brick that needs bracing before we cut into it. You decide the layout at this stage: studio versus one bedroom, kitchenette or full kitchen, where the bathroom sits. The bathroom location is the single biggest cost decision on the whole job.
Stage 2 – Permits and historic review (weeks 1 – 3, runs parallel)
We submit to the city and, if your property falls inside the historic district, into preservation review as well. That review can add two to four weeks on its own, and it can dictate exterior details like door and window profiles. You won’t have to chase the paperwork; we handle submittal and respond to plan-check comments. You will need to sign off on any design change the reviewer requests.
Stage 3 – Demo and rough-in (weeks 3 – 6)
Out comes the old garage door, the opener track, any shelving and the existing slab if it’s cracked past saving. Then we frame the new interior walls, run plumbing to the bathroom and kitchenette, pull dedicated electrical circuits, and rough in HVAC or a ductless mini-split. This is the noisiest, messiest stretch. You’ll make your fixture and appliance selections in this window so nothing holds up the next phase.
Stage 4 – Insulation, drywall and finishes (weeks 6 – 12)
Spray foam and batt insulation go in, then drywall, then the finishes: flooring rated for slab-on-grade, cabinets, counters, tile in the bath, paint. Desert heat is unforgiving on a garage-turned-living-space, so the insulation spec and the mini-split sizing matter more here than they would in a main house.
Stage 5 – Inspections and closeout (weeks 12 – 16)
Rough inspections happen before drywall; final inspections happen after finishes. We schedule them, meet the inspector on site and correct anything flagged. Your last walkthrough is where we hand over the signed-off unit and the 730-Day Done Right Promise in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
Most of the swing between a $45,000 job and a $130,000 job lives in these decisions:
- Bathroom placement: Putting the bath against an existing exterior wall where drain lines can drop straight out keeps cost down. Trenching a new drain across the slab or tying into a bathroom on the far side of the house is where budgets climb.
- Kitchenette versus full kitchen: A sink, mini-fridge and counter run is a fraction of the cost of a full kitchen with a range, venting and appliance circuits.
- Ductless mini-split versus extending the house HVAC: A mini-split is usually cheaper and easier to install, and it suits a converted garage’s odd shape. Extending existing ductwork only makes sense when the main system has capacity to spare.
- Flooring over slab: Luxury vinyl plank holds up well over desert slabs and won’t crack with minor movement; porcelain tile lasts longer but costs more in labor; carpet is the cheapest and the worst choice for a slab that moves.
- Window and door grade: Inside the historic district, exterior doors and windows may be required to match original profiles. That’s a real line item, often $3,000 – $8,000 above standard replacement vinyl.
- Whether you finish the exterior at all: If the garage door opening stays as a garage, you pay for a new door. If you’re converting, you pay to frame, insulate and finish it, then add a matching facade.
What a Garage Conversion ADU Costs in Boulder City, NV

Plan on $45,000 – $130,000 for a garage conversion ADU in Boulder City. Here’s what moves the number:
- Garage size and ceiling height: A single-car garage is the low end. A double garage you’re splitting into living space plus a bedroom pushes toward the high end just on square footage.
- Existing condition: Undersized or knob-and-tube wiring, no insulation, a failing slab, unreinforced brick walls that need structural help. These are the surprises that appear in older Boulder City homes.
- Plumbing and electrical relocation: The single biggest variable. A bath that sits where drains already exit costs far less than one that requires trenching.
- Material grade: Builder-grade cabinets and LVP flooring keep you near the bottom of the range; a KraftMaid kitchen and stone counters push toward the top.
- Permit and historic-review scope: Preservation review adds time and, in some cases, mandated exterior detailing. We always price this separately and in writing.
A written estimate from us covers demo, framing, rough-in trades, insulation, drywall, finishes, permits and inspection coordination. What it typically doesn’t cover is appliances you supply yourself, any structural repair discovered after demo starts, and landscaping once the old driveway apron is gone. The instant homeowners often pair this with Concrete Driveways & Concrete Work in Boulder City is when the old apron gets torn out and needs replacing. No surprise line items, no change orders behind your back; the number we quote is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Boulder City Homes Do to a Garage Conversion
Boulder City is a federally chartered 1931 company town, built by the Bureau of Reclamation to house Hoover Dam workers, and most of the original bungalows and modest cottages sit near the historic district. That history walks straight into this job. We regularly find unreinforced brick walls, pier-and-beam foundations and original knob-and-tube wiring in these homes, which means a garage that looks solid from the driveway can need bracing or rewiring before we close it in. Preservation review is the other reality: a window or door spec that’s routine in Henderson may come back flagged here because it has to match a 1930s divided-light profile. Add Mojave Desert heat with summer highs at 100 – 110°F and expansive soils that shift a slab over time, and the insulation and foundation work on a Boulder City conversion matters more than on the same job in a newer house. Our technicians have up to 12 years of experience and we cover every corner of Boulder City, from the historic core out toward the newer infill east of it. When the wider project scope grows into a full second unit or an attached addition, that’s covered on our Home Additions & ADU in Boulder City page.
Serving Boulder City, NV – Our Local Coverage Area
We serve Boulder City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Boulder City

Most run 10 to 16 weeks, with historic-district projects often landing at the upper end because preservation review adds two to four weeks before construction even starts. Call (888) 282-1693 and we’ll give you a real timeline for your specific garage.
Yes, converting a garage to a legal dwelling unit requires building permits, and inside the historic district it can also trigger review under the city’s preservation ordinances. We handle the submittal and inspections, so you’re not the one chasing plan-check comments.
Sometimes, but not usually. A bath needs drain and supply lines, and a garage rarely has them in the right place. On older Boulder City properties the foundation or walls may need structural attention too. That’s why we assess before we quote, not after demo starts.
Most projects land between $45,000 and $130,000, with bathroom placement and existing wiring and foundation condition driving the spread more than square footage does. Call (888) 282-1693 for a written line-item estimate; the on-site visit is free.
Every conversion we build is covered by our 730-Day Done Right Promise: if something isn’t done right, we come back and make it right. Calls are answered by a live person 24/7, so you’re never stuck leaving a voicemail when something needs attention.
Get a Free Estimate on Your Boulder City Garage Conversion
If you’re weighing a garage conversion ADU in Boulder City, start with a free on-site estimate. Call (888) 282-1693 and a live person picks up any hour. We’ll look at the foundation, wiring and garage door opening, talk through what the city will require, and hand you a written line-item quote with permits and inspections built in. From foundation to finish line, one contractor, one number, backed in writing.
Written by the team at Groundwork Construction Co.