







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Paradise: What It Takes and What It Costs
A garage conversion ADU in Paradise typically runs $45,000 – $130,000 and takes 4 – 7 months from permits to final inspection, depending on whether you’re adding a bathroom, kitchenette, or full utility upgrade. The work turns an existing attached or detached garage into a legal, rentable or family-ready dwelling. Call (888) 282-1693 to schedule a free on-site estimate and we’ll tell you exactly where your garage falls in that range. In a city where a guest suite or rental unit carries real monthly value, a garage conversion is usually the least expensive route to square footage you can actually use.
How a Garage Conversion ADU Comes Together, Stage by Stage

Every conversion we run in Paradise follows the same five-stage sequence. The timing shifts with the garage’s condition and how much plumbing you’re adding, but the order doesn’t.
Stage 1: Feasibility and layout (week 1)
We walk the garage, measure clearances, and check what’s already there: slab condition, ceiling height, existing electrical service, and whether the garage shares a wall with the house. You decide the big question here: studio versus one-bedroom, and whether you want a full kitchen or a kitchenette. We confirm setback and access requirements with Clark County before anything moves. By day three you have a layout and a written line-item estimate, not a ballpark number.
Stage 2: Permits and engineering (weeks 2 – 6)
Garage conversions require a building permit in Paradise, and that’s where the schedule usually lives. Plan review for a residential conversion commonly runs four to six weeks with Clark County, longer if structural work, a new bathroom, or a separate utility meter is involved. You sign off on the drawings during this window. We handle the submittal, the corrections, and the inspection scheduling.
Stage 3: Demo and rough-in (weeks 6 – 10)
Once the permit is in hand, we demo what’s coming out, frame any new interior walls, and run the rough work: electrical circuits and panel capacity, plumbing for the bathroom and kitchenette, and HVAC. The garage door opening gets framed and insulated into a real wall, often with a window or glazed door where the old door sat. This stage ends with the rough-in inspection. You choose fixture locations and confirm the electrical layout before walls close.
Stage 4: Insulation, drywall, and finishes (weeks 10 – 18)
This is the longest visible stretch. We insulate to code, hang and finish drywall, then set flooring, cabinetry, tile, fixtures, and paint. You pick materials at the start of this stage, not mid-stream, so nothing sits waiting. Most of the finish decisions – flooring grade, vanity style, countertop, appliance package – are made by week five so the trades don’t stall.
Stage 5: Final inspection and walkthrough (weeks 18 – 26)
We schedule the final inspection, correct anything the inspector flags, and walk the finished unit with you. You get a punch list resolution and the 730-Day Done Right Promise in writing. If it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
Most of the cost spread in a garage conversion ADU comes down to what you specify. Here’s where the real decisions sit.
- Slab versus raised floor. Existing concrete is the cheapest base but often cold and uneven; a raised subfloor adds roughly 4 – 8 inches of height and better insulation for a few thousand more. Worth it if the garage slab has cracks or heaves.
- Bathroom scope. A half bath keeps plumbing short and cheap; a full bath with a tiled shower needs a real wet wall and vent stack. Fixtures from Delta or American Standard sit in the value tier; Toto and similar move you up. Schluter waterproofing systems are worth the cost in a wet room you’ll actually rent out.
- Kitchenette versus full kitchen. A countertop with a sink, fridge, and microwave runs a fraction of a full range-and-dishwasher kitchen. Full kitchens need dedicated circuits and venting, which pushes the electrical budget.
- HVAC approach. Extending the house system is cheapest if capacity allows; a ductless mini-split is more reliable for a separately-metered unit and runs a few thousand more.
- Metering. A sub-meter or separate utility metering lets you rent with confidence. It’s a permitting and utility-coordination cost, not a materials one, and it’s the single choice that most changes the monthly value.
What Garage Conversion ADU Costs in Paradise, NV

Expect $45,000 – $130,000 for a garage conversion ADU in Paradise. The low end is a studio with a half bath and an existing slab. The high end is a one-bedroom with a full bath, full kitchen, separate metering, and structural or plumbing relocation. Five variables move the number:
- Size and layout. A single-car garage under 250 sq ft caps what you can build; a two-car or oversized garage opens the door to a true one-bedroom.
- Existing condition. Cracks, settling, or a slab that needs leveling all add to the base. Paradise blocks in the 89105 ZIP often sit on clay soil, and older garages sometimes need extra foundation prep before framing starts.
- Moving plumbing and structure. Keeping the bathroom near the existing house wet wall is cheaper. Relocating a beam or cutting in a new load path adds engineering and cost.
- Material grade. Builder-grade versus mid-range cabinetry, tile, and fixtures can swing the finish budget by tens of thousands.
- Permit scope. Structural work, separate metering, and a full kitchen each widen what Clark County reviews, which widens the schedule and the fee.
A written estimate from us lists what’s included – demolition, framing, rough-in trades, insulation, drywall, finishes, and the final inspection – and what typically isn’t: utility connection fees, separate meter charges, and any landscaping or driveway work around the converted garage. We quote it line by line so there’s no surprise.
See the difference
Before
After
Before
After
Before
AfterWhat Paradise Homes Specifically Do to This Job
Paradise’s housing stock is a mix of mid-century tract homes and apartments from the 1950s through the 1970s alongside the high-rise resorts and casino corridor, so the garages we convert were rarely built with a dwelling in mind. That matters in three ways. Ceiling height and slab condition are the first unknowns, and older blocks in the 89105 ZIP frequently carry clay soil issues that need foundation prep before we frame. Second, the extreme summer heat and sun exposure shape the schedule: concrete curing and adhesive limits push exterior-facing work into early mornings, and insulation and HVAC sizing get taken seriously because a conversion that runs hot is a conversion nobody rents. Third, the local construction culture itself is set by the constant strip-mall and casino-corridor renovation along the Strip and Convention Center, where projects phase around 24/7 operations and strict commercial codes – a discipline that bleeds into how local crews respect neighbors, dust control, and inspection timing. That experience working around operating properties is why we keep a clean, tight jobsite on a residential street. If your conversion is part of a full Home Additions & ADU in Paradise plan, we scope both together so the site work, utilities, and access get sequenced once.
Serving Paradise, NV – Our Local Coverage Area
We serve Paradise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Garage Conversion ADU in Paradise

Plan on 4 to 7 months from signed estimate to final inspection, and most of that is permitting. Construction itself runs 10 to 16 weeks once the permit clears. Call (888) 282-1693 for a schedule built around your specific garage.
Yes. A garage conversion ADU in Paradise requires a Clark County building permit, and the conversion has to meet residential code for insulation, egress, and utility hookups. We handle the submittal, corrections, and inspection scheduling. Call (888) 282-1693 and we’ll walk you through what your specific project needs.
Often yes. If the bathroom lands near the house’s existing wet wall and the garage framing is sound, we avoid major structural changes entirely. That’s the version that lands closest to the low end of the range. Call (888) 282-1693 and we’ll tell you after a walkthrough.
The range is $45,000 – $130,000, with a studio on an existing slab near the bottom and a full one-bedroom with separate metering near the top. The biggest swing factors are bathroom scope, kitchen versus kitchenette, and foundation condition. Call (888) 282-1693 for an exact written quote – estimates are free.
Every conversion we build is covered by the 730-Day Done Right Promise. If it’s not done right, we make it right – in writing, for two years. Call (888) 282-1693 to schedule your free estimate and design consult.
Schedule Your Free Estimate
We’ll come out, measure the garage, check the slab and service, and hand you a written line-item estimate with a realistic timeline for your Paradise project. No pressure to sign on the spot. Call (888) 282-1693 – a live person answers around the clock, and we’ll get your estimate on the calendar. If your conversion is part of wider work, our Home Additions & ADU team covers it under one contract. Homeowners around Paradise often pair the garage work with fresh Concrete Driveways & Concrete Work in Paradise once the old apron is cleared, or with Asphalt Driveways & Resurfacing in Paradise when the garage frontage needs reworking. Background-checked, uniformed technicians; upfront pricing, no surprises; $1,000 off projects over $10,000 and 0% financing for 18 months.
Written by the team at Groundwork Construction Co. of Boulder City.












