A Groundwork company - serving Boulder City, NV
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Sunrise Manor, NV

New Detached ADU in Sunrise Manor - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Boulder City
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Sunrise Manor, NV: What It Costs and How Long It Takes

A new detached ADU in Sunrise Manor typically runs $45,000 to $130,000 depending on size, finish level, and how much site work your lot needs, and most builds take four to seven months from permit approval to final inspection. You get a separate, self-contained living unit with its own entry, kitchen, bath, and utilities. Call (888) 282-1693 and we’ll walk your lot, talk through size options, and give you a written, line-item estimate at no cost.

Call (888) 282-1693

How we build a detached ADU here, stage by stage

A finished backyard cottage with a small covered porch

Detached ADU work has a rhythm. Get the sequence right and the schedule holds. Skip a step and you’re paying for it twice.

Stage 1: Site walk and scope (week 1). We measure setbacks, check where your main panel and water line sit, and walk the soil conditions with you. This is where you decide rough size and whether the unit is a studio, one-bedroom, or two-bedroom. You’ll get a written estimate before anyone touches a shovel.

Stage 2: Permitting with Clark County (weeks 2 – 8, sometimes longer). Sunrise Manor is unincorporated, so residential ADU permits go through Clark County rather than the City of Las Vegas. Plan review can run six to ten weeks on a detached unit because it touches zoning, structural, energy, and utility review all at once. We handle the submittal and the corrections. You approve the drawings before they go in, and you’ll see every revision request.

Stage 3: Site prep and foundation (weeks 1 – 3 after permit). Demo of any existing slab or shed, grading, utility trenching out to the main line, then the slab pour. On Sunrise Manor’s clay-heavy lots this is where we spend the most care: proper compaction and a reinforced slab matter more here than almost anywhere. Because of summer heat, concrete gets poured early morning and cured under moisture, not left to bake. If your ADU also needs a new drive or widened approach, homeowners often pair this with Concrete Driveways & Concrete Work in Sunrise Manor while the equipment is already on site.

Stage 4: Framing, rough-in, and inspections (weeks 4 – 11). Framing goes up, then plumbing, electrical, and HVAC rough-in, each followed by a county inspection before the walls close. You’ll pick fixtures around this point – shower trim, vanity, panel location – because once drywall goes on those choices get expensive to change.

Stage 5: Finish, final inspection, and handover (weeks 12 – 16). Drywall, insulation, cabinets, counters, flooring, paint, exterior stucco to match the main house. Final inspection, then a walkthrough with you on the punch list. Every ADU we build carries our 730-Day Done Right Promise, so if something isn’t right after move-in, we come back and fix it.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll actually choose between

  • Size and layout: A 500 – 600 sq ft studio keeps costs near the low end and suits a rental or aging parent. A 900 – 1,200 sq ft one- or two-bedroom pushes toward the top of the range but rents for more and holds resale value better. The layout decision drives everything downstream, so make it first.
  • Foundation and slab: Standard reinforced slab-on-grade is the default and the most economical. On lots with more expansive clay, a post-tensioned or deeper-engineered slab costs more upfront but resists the heaving that cracks ordinary slabs in this soil.
  • Exterior finish: Stucco to match the main house is the norm in Sunrise Manor and the cheapest way to keep the unit looking like it belongs. James Hardie siding costs more and needs repainting less often, but the color-match to your existing stucco won’t be as tight.
  • Roofing: Tile to match your main roof looks consistent and handles the sun well; a standing-seam metal roof costs more but sheds heat and lasts longer. Either way, go with a manufacturer-backed product – GAF or CertainTeed both hold up in Mojave heat.
  • Windows and doors: Impact-rated or high-SHI glass is worth the money here. It cuts cooling load in a 105°F summer and holds up to wind-blown dust and the occasional monsoon gust. Andersen and Pella both make units sized for ADU walls.
  • Kitchen and bath: A compact kitchen with KraftMaid cabinets and a solid-surface or Cambria counter is the sweet spot for a rental-grade ADU. A full-size range and dishwasher push cost up but widen who’ll rent it.
  • Utilities: Tying into the main house panel versus a separate meter is a real decision. A subpanel is cheaper; a separate meter lets you bill a tenant directly and is worth checking with the county before you commit.

What a New Detached ADU costs in Sunrise Manor, NV

A framer checking new wall framing on a home addition

Plan on $45,000 to $130,000 for a detached ADU in Sunrise Manor. That spread isn’t arbitrary – five things move the number:

  • Size: Every additional 100 sq ft adds roughly $9,000 – $14,000 in materials and labor once you’re past the 500 sq ft mark.
  • Site condition: A flat, clear lot with utilities close by keeps you at the low end. Trenching long runs to a distant main, removing an old shed or slab, or hitting problem soil pushes you up.
  • Utility relocation: Moving the main panel, running a new water line, or adding a separate meter each add real cost. This is where budgets quietly grow.
  • Finish grade: Rental-grade laminate and a basic bath sit near $45,000 on a small unit; a two-bedroom with tile, quartz counters, and upgraded fixtures lands in six figures.
  • Permit scope: A standard detached unit is one permit path. Anything unusual – a two-story ADU, a shared wall with an existing structure, or a lot with setback issues – adds review time and engineering fees.

Your written estimate breaks out foundation, framing, mechanical, finishes, and permits as separate line items, with the number you see being the number you pay. We don’t do change-order surprises. What typically isn’t included: landscape restoration, fencing around the new unit, and separate-meter utility hookup fees charged by the utility. Those get quoted separately so nothing’s buried.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sunrise Manor homes specifically do to this job

Most of the housing stock here is 1980s-to-2000s stucco tract homes on slab foundations, with tile roofs and lots that were graded for a single structure and never planned for a second one. That shows up in three ways on ADU work. First, backyard setbacks in these subdivisions are tight, so the unit’s footprint and where it ties into the main panel and water line get decided early. Second, the expanding clay soils common in this part of the valley crack slabs and heave driveways, which means the ADU’s foundation needs engineering that accounts for it, not a generic slab. Third, Clark County’s dust-control rules require stabilized access and water trucks on dirt lots – especially during high-wind alerts – so site prep and grading have to work around that.

The summer heat shapes the schedule as much as the code does. Concrete pours and stucco work go early morning; nobody’s pouring a slab at 2 p.m. in July and getting a sound result. If you’re in one of the newer infill subdivisions off the eastern edge, check your HOA rules on detached structures before drawings start – some restrict size, roof pitch, or exterior color. We build across Sunrise Manor and the surrounding east valley, and we’ll flag HOA constraints on the first visit.

Serving Sunrise Manor, NV – Our Local Coverage Area

We serve Sunrise Manor and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in Sunrise Manor

A new multi-panel patio door opening a kitchen to the patio

Get a free estimate for your New Detached ADU in Sunrise Manor

Call (888) 282-1693 to schedule a free on-site estimate for a new detached ADU in Sunrise Manor. A live person answers, 24 hours a day, seven days a week. We’ll walk your lot, talk size and layout, flag any HOA or setback issues, and give you a written line-item estimate with the full price before you commit. 0% financing for 18 months is available, plus $1,000 off projects over $10,000.

Written by the team at Groundwork Construction Co.

Why Sunrise Manor Chooses Groundwork Construction Co. of Boulder City

We set the standard for new detached ADU in Sunrise Manor.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunrise Manor

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunrise Manor Customers Say

Trusted by homeowners across Sunrise Manor and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver border

More services in Sunrise Manor

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Boulder City

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Boulder City team

A local vetted partner works across Boulder City and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Sunrise Manor?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunrise Manor.

(888) 282-1693

Request a Free Estimate in Sunrise Manor

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch