A Groundwork company - serving Boulder City, NV
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Whitney, NV

New Detached ADU in Whitney - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Boulder City
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Whitney, NV: What It Takes and What It Costs

A new detached ADU in Whitney typically runs $45,000 – $130,000 and takes four to seven months from permit to final inspection. The structure is a fully separate dwelling on your lot: its own foundation, its own utilities tied into your home’s service, its own kitchen and bath. Call (888) 282-1693 for a free on-site estimate and we’ll walk your lot and give you a real number.

Call (888) 282-1693

How the build actually runs, stage by stage

A single-story rear room addition with tall windows and a new patio

Detached work on Whitney’s county-jurisdiction lots moves in a sequence. Here’s what happens and when, and where you have to make a decision.

Stage 1 – Site walk and feasibility (week one). We look at where the structure can sit given setbacks, existing utility runs, and your slab or grade. You decide the footprint and roughly where the ADU goes on the parcel. This is the stage where a lot that looks simple turns out to have a sewer line or a mature tree in the way, and it’s better to know now than mid-pour.

Stage 2 – Design and permitting (weeks two through eight or more). Drawings, structural, and the Clark County building permit application. Because Whitney is unincorporated, that application goes to the county, not a city building department, and the review calendar is the county’s. You approve the final plan set here. This is the longest waiting stretch and the one you can’t compress.

Stage 3 – Site prep and foundation (weeks eight to twelve). Grading, trenching for utilities, and the concrete pour. In summer we pour early morning because a Mojave afternoon will cook a slab before it cures right. You sign off on the utility trench locations before backfill.

Stage 4 – Framing through rough-in (weeks twelve to eighteen). Walls, roof, then electrical, plumbing, and HVAC rough-in, followed by the county’s rough inspections. You’ll pick fixtures and finishes during this window so nothing delays the finish work. Drywall closes the walls after rough inspection passes.

Stage 5 – Finishes and final inspection (weeks eighteen to twenty-eight). Cabinets, counters, tile, flooring, paint, trim, and the final county inspection and utility hookups. You do a walkthrough with us before we call it done.

That’s the honest shape of it. Weather, county review backlogs, and material lead times all move the end date. We give you the schedule in writing and tell you when something shifts.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between

A detached ADU is a small house, so the same decisions apply, just compressed. Here’s what actually comes up and how each choice plays out.

  • Slab-on-grade vs. a raised foundation. Slab is the standard choice here and the cheaper one on Whitney’s fairly flat parcels. A raised floor costs more but handles odd grade and can make future plumbing work easier.
  • Stick-framed wood vs. other wall systems. Wood frame with stucco exterior matches Whitney’s existing housing stock and the local trade base knows it well. It’s the default for a reason.
  • Kitchen and bath fixtures. Standard builder-grade fixtures keep the number down; a Delta or American Standard package sits in the middle and holds up well for a rental or family use. A Toto toilet and better fittings push the budget up but earn it back over a long hold.
  • Tile and waterproofing. A Schluter waterproofing system in the shower is the one upgrade we push hardest. A leak in an ADU bath means opening a wall, and the membrane is cheap insurance against that.
  • Own meter vs. tied to the main house. A separate utility meter costs more upfront but simplifies billing if you’ll rent the unit. Tying into your existing service is cheaper and faster to permit.
  • Kitchenette vs. full kitchen. A full kitchen with a range and full-size fridge costs more and drives more utility load. A kitchenette suits a guest suite or studio rental and trims the budget noticeably.

What a New Detached ADU costs in Whitney, NV

A framer checking new wall framing on a home addition

Plan on $45,000 at the low end for a compact, simply finished unit and up to $130,000 for a larger, fully appointed one with a separate meter. That spread is wide because five things move the number more than anything else:

  • Size and footprint. Square footage is the biggest lever. Every added hundred square feet adds foundation, framing, roof, and finishes.
  • Utility distance. The farther the ADU sits from your existing panel and sewer line, the more trenching, conduit, and wire you pay for.
  • Finish grade. Builder-grade cabinets and counters vs. upgraded ones can swing the kitchen and bath portion by a wide margin.
  • Site conditions. Odd grade, old slab to remove, or a tight infill lot along Boulder Highway adds prep cost.
  • Permit and inspection scope. A separate meter, a full kitchen, or fire separation requirements add county review and inspection steps.

A written estimate from us lists line items: site prep, foundation, framing, utilities, finishes, permits, and inspections. What it won’t include unless we say so in writing is landscaping beyond basic grade, furniture or appliances you buy yourself, or utility company connection fees. The number you see is the number you pay, and projects over $10,000 get $1,000 off. Financing at 0% for 18 months is available if spreading the cost helps.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Whitney homes specifically do to this job

Whitney is unincorporated Clark County, wedged between Las Vegas and Henderson, so a detached ADU here runs on county permitting and county inspections, not a city building department. Contractors who spend most of their week inside Henderson or Las Vegas have to switch permit authorities to work a Whitney job, and that catches people out. We pull the Clark County permit and schedule county inspections from the start.

The other local reality is the lot itself. Much of Whitney’s 89122 build-out is infill and redevelopment of older parcels along Boulder Highway and the tracts off it, and the housing stock is largely mid-century to 1970s-80s single-story stucco-and-slab homes, with manufactured housing pockets and small commercial strips mixed in. That means your ADU often goes onto a lot with an aging slab, mature trees, and utility runs that predate current code. We plan for that in the site walk. The desert heat matters too: concrete, stucco, and roofing get scheduled early morning, and monsoon-season wind and flash flooding affect site drainage and exposed framing. A well-drained lot with the ADU sited to shed water is part of the job, not an afterthought. If you’re weighing a detached unit against a wider remodel, our Home Additions & ADU in Whitney page lays out the full scope, and our Whitney service-area page covers how we work across the community.

Serving Whitney, NV – Our Local Coverage Area

We serve Whitney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in Whitney

A freestanding soaking tub in a remodeled primary bathroom

Get a real number for your Whitney ADU

A phone call won’t cost you anything. When you call (888) 282-1693, a live person answers, and we’ll set a free on-site estimate where we look at your lot, talk through footprint and budget, and hand you a written line-item quote. If you’re already planning the surrounding lot, homeowners often pair this with Concrete Driveways & Concrete Work in Whitney, and it all pulls together under our Home Additions & ADU service. You can also add a Paver Driveways in Whitney finish for the approach. We’re ready when you are.

Written by the team at Groundwork Construction Co.

Why Whitney Chooses Groundwork Construction Co. of Boulder City

We set the standard for new detached ADU in Whitney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Whitney

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Whitney Customers Say

Trusted by homeowners across Whitney and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gate

More services in Whitney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Boulder City

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Boulder City team

A local vetted partner works across Boulder City and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Whitney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Whitney.

(888) 282-1693

Request a Free Estimate in Whitney

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch