Cabinets & Countertops in Summerlin, NV: What the Job Actually Involves
Cabinets & countertops in Summerlin typically run $14,000 – $45,000 for a full replacement of both, and most jobs take two to four weeks from demo to final caulk. The bulk of that time isn’t installation; it’s the template wait on stone and the cabinet lead time before your installers ever arrive. Call (888) 282-1693 and we’ll walk your space and give you a written, line-item number. Estimates are free, and nothing gets ordered until you’ve signed off on the layout.
How We Run a Cabinet and Countertop Job, Stage by Stage

This isn’t a vague “we handle everything” pitch. Here’s the actual order of operations and where your decisions land.
- Stage 1 – Measure and layout (day 1). We template the room, check for out-of-square walls (common in 1990s Summerlin builds), and confirm appliance sizes. You decide the cabinet door style, finish, and box construction at this point, because those choices set the lead time.
- Stage 2 – Order and confirm (days 2 – 5). Cabinets go on order; slab or quartz is selected and held. This is where a job either stays on schedule or slips three weeks because a finish is backordered. We tell you the real date up front rather than promising a number and missing it.
- Stage 3 – Demo and prep (1 – 2 days). Old cabinets and counters come out, we cap or move utilities as scoped, and we check the substrate. If a wall needs patching or a floor needs leveling under the new cabinet line, that gets flagged now, not after install.
- Stage 4 – Cabinet install (2 – 3 days). Boxes set, leveled, shimmed, and shimmed again. Doors and drawers go on last. You confirm hardware placement before we drill.
- Stage 5 – Template, fabricate, install stone (7 – 14 days). The countertop is templated after cabinets are set – that’s the only way it fits right. Fabrication is the long pole. Sink cutout, edge profile, and backsplash height get locked at template.
Add a final day for backsplash, caulk, and cleanup. Total realistic window: two weeks on a straightforward swap, four weeks if you’re changing the layout or waiting on a special-order door.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make (and What Each One Costs You)
Most homeowners get stuck on three decisions: cabinet construction, countertop material, and whether to reconfigure the layout. Here’s the honest trade-off on each.
- Cabinet boxes – stock vs. semi-custom vs. custom. Stock gets you in fast and cheap but limits sizes. Semi-custom (KraftMaid is our benchmark here) balances size flexibility with a lead time you can plan around. Full custom costs the most and takes the longest. For most Summerlin kitchens, semi-custom wins on value.
- Countertop – quartz vs. natural stone vs. laminate. Quartz (Cambria, for example) is non-porous and forgiving in a dry climate; it’s the default for good reason. Granite is beautiful but wants sealing. Laminate is the budget play and shows wear faster in a busy kitchen.
- Layout changes. Keeping plumbing and gas where they are saves real money. Moving a sink or range means rough-in work and, often, a permit.
- Edge profile and backsplash height. Small line items that change the look more than the price. Decide them at template, not after.
We keep a curated set of brand partners so you’re choosing quality, not whatever’s in stock that week. When the scope grows past cabinets and counters – new flooring, lighting, a wall coming down – that’s part of a full Kitchen Remodeling in Summerlin, and we’ll scope it that way from the start.
What Cabinets & Countertops Cost in Summerlin, NV

Plan on $14,000 – $45,000 for cabinets and countertops together in Summerlin. A like-for-like swap in a standard kitchen lands near the bottom; a layout change with premium stone and semi-custom cabinetry pushes toward the top.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
What pushes a job from the low end to the high end:
- Kitchen size. More linear feet of cabinet and counter means more of everything.
- Layout changes. Relocating plumbing, gas, or electrical adds rough-in labor and usually a permit.
- Material grade. Stock boxes with laminate sit at one end; semi-custom with a premium quartz slab sit at the other.
- Existing condition. Out-of-square walls, water damage, or a floor that needs leveling all add prep time.
- Permit scope. A straight swap often needs nothing; moving a sink or a wall does.
Our written estimate is line-item, and the number you see is the number you pay. No change orders sneaking in mid-job. If you’d rather spread the cost, 0% financing for 18 months is available, and projects over $10,000 get $1,000 off.
See the difference
Before
After
Before
After
Before
AfterWhat Summerlin Homes Specifically Do to This Job
Summerlin is two markets at once. The gated ridge communities expect high-end finishes and can absorb a custom cabinet package; the continuous stream of tract and semi-custom builds a few streets over need production-grade scheduling and finishes that are still available. That split matters most when we’re matching a discontinued door profile in an older village – the east-side neighborhoods like The Trails still carry 1990s stucco-clad stock with the original cabinetry, and sourcing a match takes real legwork. In the newer northwest subdivisions, the homes are contemporary desert-modern, and the challenge is different: everything is on a tight, predictable schedule and the HOA design review has opinions. Beyond the build era, the desert works against cabinetry too – low humidity and wind-driven grit dry out and pit finishes, and harsh summer heat warps cheap doors over time. That’s why box construction and finish quality earn their keep here more than in a milder climate. We work in active HOAs with strict design review regularly, so we know what the architectural committee will and won’t approve before you order anything.
Serving Summerlin, NV – Our Local Coverage Area
We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Summerlin

Two to four weeks from demo to completion, depending mostly on cabinet lead time and stone fabrication. The install itself is quick; the waiting is in the materials. Call (888) 282-1693 for a timeline tied to your specific finishes.
Usually not for a straight replacement. A permit typically comes into play when you move plumbing, gas, or electrical, or take out a wall. We’ll tell you exactly what your scope triggers before work starts.
Yes, and it’s the most common way we do it. Keeping the sink and range where they are avoids rough-in work and a permit, and saves you real money.
Between $14,000 and $45,000 for both, with the lower end for a like-for-like swap and the upper end for layout changes and premium materials. Call (888) 282-1693 for an exact quote – estimates are free.
Every job is backed by our 730-Day Done Right Promise – if it’s not done right, we make it right. That covers workmanship for two full years, well past the point most contractors’ warranties end.
Get a Free Estimate for Cabinets & Countertops in Summerlin
Call (888) 282-1693 to schedule a free on-site estimate. We’ll measure the space, talk through cabinet and countertop options, and hand you a written line-item price with the real lead times attached. A live person answers, day or night. Prefer to think about the bigger picture first? Our kitchen remodeling service covers the full scope, and we serve every corner of Summerlin. Homeowners planning a bigger layout change often pair this with a Garage Conversion ADU in Summerlin or a New Detached ADU in Summerlin – if that’s on your list, we can scope both in one visit.