A Groundwork company - serving Boulder City, NV
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Henderson, NV

New Detached ADU in Henderson - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Boulder City
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a New Detached ADU in Henderson, NV Really Involves

A new detached ADU in Henderson typically runs $45,000 – $130,000 depending on size, foundation work, and finish level, and most projects take four to seven months from permit application to final inspection. The ADU is a fully separate structure on your lot with its own foundation, utilities, and entry, not a converted garage or an attached addition. If you’re weighing the numbers right now, call (888) 282-1693 and we’ll walk through what your specific lot can actually hold before you spend a dollar on design.

Call (888) 282-1693

How We Build a New Detached ADU in Henderson, Stage by Stage

A garage converted into a guest room and home office

The sequencing matters more than almost anything else on this job, because a detached ADU means a second structure fighting the same tight lot, the same soil, and the same inspection calendar as your house. Here’s how the work actually unfolds.

Stage 1: Site walk and feasibility (week 1)

We start on your lot, not in an office. We measure setbacks, check where the sewer lateral and water main run, note slope and drainage, and look at how a second structure will sit against your existing fence line and driveway. You’ll decide the rough footprint and whether you want one story or two. This is also when we flag title restrictions or deed limitations that could cap what you’re allowed to build.

Stage 2: Design, engineering, and permit submittal (weeks 2 – 6)

Your ADU needs a stamped structural set, a site plan, and a grading and drainage plan. In Henderson that grading piece isn’t optional paperwork: expansive soils and dust-control rules mean the plan has to address how the pad is prepared and how runoff leaves the lot. You’ll make your big decisions here, including exterior finish, roof type, and whether the unit gets its own utility meters. Submittal to the city starts the review clock, which commonly runs six to twelve weeks.

Stage 3: Excavation and foundation (weeks 7 – 10)

This is where Henderson lots surprise people. Caliche and cemented desert soil often require hoe-ram work or pre-drilling before pier footings go in, and that excavation can add days and real money. We pour the slab or raised foundation and set the anchoring system, then get the first inspection signed off before any framing starts. You’ll approve the final pad elevation at this stage, since it drives drainage and finish floor height.

Stage 4: Framing, utilities, and dry-in (weeks 11 – 18)

Walls go up, the roof goes on, windows and doors set, and the exterior gets dried in so interior work isn’t fighting the sun. Rough plumbing, electrical, and HVAC run through the walls and get their own inspection before anything closes up. Your decisions here are the ones that affect daily living later: window placement, where the kitchenette sits, whether the bedroom gets a walk-in closet, and how the unit connects to the main house’s power.

Stage 5: Finishes and final inspection (weeks 19 – 26)

Insulation, drywall, flooring, cabinets, fixtures, paint, and landscaping at the end. Final inspection clears the certificate of occupancy, and you walk the unit with us before we call it done. Every bit of the workmanship is covered by our 730-Day Done Right Promise, so anything that settles, cracks, or fails to work the way it should gets made right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your New Detached ADU

Most of the cost swing between a $45,000 build and a $130,000 one comes down to a handful of decisions. Here’s what you’re actually picking between, with the honest trade-off on each.

  • Foundation type. A post-tension slab is the standard in Henderson tract neighborhoods and usually cheaper, but any future work that cuts into it needs cable scanning first. A raised stem-wall foundation costs more upfront and gives you better separation from soil movement on sloped lots.
  • Footprint and story count. A 500-square-foot one-story unit keeps excavation and framing simple. Pushing to 900 square feet or adding a second story raises structural, roofing, and stair costs faster than the square footage alone suggests.
  • Exterior finish. Stucco matches most Henderson housing stock and holds up well against UV when it’s detailed right. James Hardie fiber cement panels cost more per square foot but resist cracking and hold paint longer in extreme heat.
  • Roofing. Tile matches the surrounding homes and handles heat well; asphalt shingle is the cheaper route and still performs here. GAF and CertainTeed systems both come with manufacturer warranties we can layer onto our own.
  • Utilities. Tying into the main house’s electrical panel is cheaper than a separate service, but only if your panel has the capacity. A dedicated meter adds cost and gives you cleaner options if you’ll ever rent the unit.
  • Interior grade. A rental-grade kitchenette and vinyl plank flooring keeps the budget tight. A full kitchen with Cambria counters and KraftMaid cabinetry pushes you toward the top of the range but earns more as a long-term rental or family suite.

What a New Detached ADU Costs in Henderson, NV

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for a detached ADU in Henderson, with most projects landing in the middle of that range once utilities and finishes are included. Five things push the number up or down:

  • Size and configuration: a compact studio lands near the bottom; a two-bedroom unit with a full kitchen pushes toward $130,000.
  • Site conditions: heavy caliche, slope, or a lot that needs retaining walls adds excavation and grading cost.
  • Utility runs: the farther the ADU sits from your main panel and sewer lateral, the more trenching and materials you pay for.
  • Finish grade: builder-grade versus premium cabinetry, counters, and flooring can swing the total by tens of thousands.
  • Permit and engineering scope: a hillside lot with drainage concerns needs more engineering and inspection than a flat interior lot.

A written estimate from us is line-item: excavation, foundation, framing, each utility trade, finishes, and permits broken out separately, so you can see exactly where the money goes. What it typically doesn’t include is landscaping beyond basic grading, furniture, and any HOA architectural review fees your community charges. The number you see is the number you pay, with no change orders sneaking in mid-build.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Henderson Lots and Homes Do to This Job

Henderson sits almost entirely on engineered ground. Nearly every subdivision was graded over caliche-hard desert soil and former gypsum and borax mining ground, which means a new detached ADU here fights expansive, cemented soils, strict Clark County dust-control and grading rules, and heavy scrutiny of foundations and retaining walls. Builders hit caliche so hard in Green Valley and Anthem that excavation often needs a hoe-ram or pre-drilled pier footings, and many homes in Seven Hills and the 89012 and 89052 corridors sit on post-tension slabs, so any utility tie-in that touches the main house slab has to be scanned for cables first. Monsoon runoff off the McCullough Range foothills makes drainage and retaining walls a real design item, not an afterthought. Most of the housing stock dates to the 1990s and 2000s build-out, which is why so many Henderson homeowners are adding an ADU now, often pairing it with Concrete Driveways & Concrete Work in Henderson to give the unit its own parking pad and a clean, graded approach. If your project grows into something bigger, the wider scope lives on our Home Additions & ADU in Henderson page, and you can see the full range of work we handle under Home Additions & ADU. We cover the whole city, from the Henderson neighborhoods near Water Street to the newer infill out toward Anthem, and we’re glad to talk through what your particular lot will allow.

Serving Henderson, NV – Our Local Coverage Area

We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Henderson

A new paver patio with a seat wall and fire pit

Get a Free Estimate for Your Henderson ADU

If you’re planning a new detached ADU in Henderson, the first step is a free on-site estimate and design consult. We’ll walk your lot, check setbacks and utility runs, and give you a line-item number you can actually plan around. Call (888) 282-1693 and a live person will pick up, day or night, ready to talk through your project and set up a time to meet you on site.

Written by the team at Groundwork Construction Co.

Why Henderson Chooses Groundwork Construction Co. of Boulder City

We set the standard for new detached ADU in Henderson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Henderson

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Henderson Customers Say

Trusted by homeowners across Henderson and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
An open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porch

More services in Henderson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Boulder City

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Boulder City team

A local vetted partner works across Boulder City and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Henderson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Henderson.

(888) 282-1693

Request a Free Estimate in Henderson

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch