A Groundwork company - serving Boulder City, NV
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Whitney, NV

ADU Site Prep & Utilities in Whitney - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Boulder City
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
A new clay tile roof
New double-hung windows in a dining room
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Whitney, NV: What the Ground Work Actually Costs

ADU site prep and utilities in Whitney typically runs $45,000 – $130,000, and the utility trenching, pad work and inspection sequence alone usually takes 5 – 8 weeks before a single stud goes up. That number covers bringing power, water, sewer and gas to a detached unit, grading and compacting the pad, and passing Clark County inspections at each stage. Call (888) 282-1693 and we’ll walk your lot with you and put real numbers on paper.

Call (888) 282-1693

How the Site Prep & Utility Work Actually Sequences

A finished backyard cottage with a small covered porch

Detached ADU work lives or dies on the site and utility phase. Here’s the order we run it in Whitney, and what you’ll be deciding along the way.

Stage 1: Utility locate and site survey (days 1 – 3)

We call in the 811 utility locate before anything gets dug, then survey the lot to find your existing sewer lateral, water main and gas stub. Your decision here: whether the ADU taps the existing service or needs a new meter and dedicated lateral. That call can swing the budget by thousands, so it happens first.

Stage 2: Excavation, trenching and grading (days 4 – 10)

Trenches go in for water, sewer, electrical conduit and gas, run to the ADU footprint at the depth Clark County requires. We grade the pad area and remove any old slab, footing or landscaping debris. On older 89122 lots, unexpected obstructions are common and add a day or two.

Stage 3: Underground utility rough-in and inspection (days 10 – 20)

Pipe, conduit and gas line get laid, bedded and backfilled, then the county inspector signs off on the underground before anything covers it. You’ll choose your electrical service size here: a 60-amp subpanel suits a small studio, 100-amp or 200-amp is the norm for a full one-bedroom with kitchen and laundry.

Stage 4: Pad pour and utility stub-ups (days 20 – 35)

We form and pour the slab, with stub-ups for every utility set exactly where the plan calls for them. Mojave heat means early-morning pours and curing precautions, so this stage can stretch in July and August. You confirm slab elevation and finished-floor height relative to the main house.

Stage 5: Final utility connections and inspection (days 35 – 56)

Water, sewer, gas and electrical get tied in and pressure-tested, then the county performs the final utility inspection. Once that passes, the site is ready for framing. This is the stage where a failed inspection costs the most time, which is why we don’t rush the rough-in.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your ADU Site Work

Every one of these decisions has a trade-off, and the honest ones matter:

  • Slab-on-grade vs. raised foundation – A slab is the standard, cheapest path and suits Whitney’s flat lots. A raised stem-wall foundation costs more but makes future plumbing and electrical changes easier and handles minor grade differences.
  • Full utility tap vs. shared service from the main house – Sharing a water line or subpanel saves money up front. A dedicated meter and service is cleaner for separate occupancy and future resale, and avoids overloading the main panel.
  • Trench depth and bedding – Code minimum bedding is fine on stable soil. Imported sand bedding and deeper trenches cost more but protect pipe from settling on Whitney’s older fill areas.
  • Electrical service size – 60-amp for a studio, 100-amp for a one-bedroom, 200-amp if you plan EV charging or a full kitchen. Undersizing means a re-pull later, which is the most expensive fix on this list.
  • Concrete finish and aprons – A plain broom finish pad is the baseline. Exposed aggregate or stamped aprons add cost but hold up better against sun and foot traffic, and pair naturally with the Concrete Driveways & Concrete Work in Whitney work many homeowners run at the same time.

What ADU Site Prep & Utilities Costs in Whitney, NV

A framer checking new wall framing on a home addition

Site prep and utility rough-in for a detached ADU in Whitney lands $45,000 – $130,000, and the ADU build itself is separate. Here’s what moves the number:

Line item Typical range
Site survey, locate & grading $2,500 – $6,000
Trenching & underground utility rough-in $12,000 – $38,000
Electrical service & panel $4,000 – $14,000
Water & sewer taps $6,000 – $22,000
Gas line $1,500 – $6,000
Pad / slab pour $8,000 – $24,000
Clark County permits & inspections $3,000 – $12,000

The low end reflects a flat, clean lot with utilities close by and a modest service size. The high end is driven by long trench runs from a distant main, older buried obstructions, rocky excavation, a dedicated meter and 200-amp service, and grading that needs significant fill. What’s included in a written estimate: all of the lines above, permit fees, and inspection scheduling. What’s typically not: the ADU structure itself, landscaping restoration, and any utility-company standby charges for a new meter set.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Whitney Lots Specifically Do to This Job

Whitney is unincorporated Clark County, wedged between Las Vegas and Henderson, so ADU site prep here runs on county permitting and inspection, not a city building department. That changes the paperwork, the inspector and the schedule, and it’s a real distinction from a Henderson or Las Vegas job next door. Much of the 89122 build-out is infill and redevelopment along Boulder Highway and the surrounding tracts, so we work aging 1970s and 80s slab-on-grade stucco homes where the existing sewer lateral is often clay or older cast iron. On those lots we plan for a camera inspection before trenching, because a collapsing lateral is a common surprise that changes the tap strategy. Summer planning matters too: with highs well over 100°F, we pour pads early morning, and monsoon-season runoff means drainage grading around the ADU footprint has to be right the first time. If you’re weighing a full Home Additions & ADU in Whitney project, site prep is where the real budget decisions get made. Homeowners often pair site and apron concrete with Paver Driveways in Whitney, and Belgard or Tremron pavers hold up well to the summer intensity. We handle this across Whitney and the surrounding county tracts.

Serving Whitney, NV – Our Local Coverage Area

We serve Whitney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in Whitney

A new white vinyl privacy fence with a double gate

Get a Free Estimate on ADU Site Prep & Utilities in Whitney

Call (888) 282-1693 to schedule a free on-site estimate for ADU site prep and utilities in Whitney. We’ll walk the lot, check the utility locate and existing lateral, and hand you a line-item written quote with fixed pricing and no change orders. Our technicians have up to 12 years of experience, and our Home Additions & ADU team covers the full project when you’re ready to build.

Written by the team at Groundwork Construction Co.

Why Whitney Chooses Groundwork Construction Co. of Boulder City

We set the standard for ADU site prep & utilities in Whitney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Whitney

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Whitney Customers Say

Trusted by homeowners across Whitney and surrounding areas.

★★★★★

"We lived in the house through the whole thing. He kept the dust wall up, cleaned every Friday, and made sure we always had a working bathroom."

Craig Whitaker
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted walls

More services in Whitney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Boulder City

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Boulder City team

A local vetted partner works across Boulder City and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Whitney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Whitney.

(888) 282-1693

Request a Free Estimate in Whitney

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch