







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Concrete Driveways & Concrete Work in Paradise, NV: What It Takes and What It Costs
Concrete driveways and concrete work in Paradise, NV typically run $4,500 – $12,000 for a new driveway pour, with full replacement landing at $5,000 – $14,000. Most residential pours are a 2-day job for placing and finishing, then 5 – 7 days of curing before you park on the slab. Tight lots, alley access and 1960s – 70s slabs that were never poured over proper base are the two things that push a Paradise job toward the high end. Call (888) 282-1693 for a free on-site estimate.
How a concrete driveway gets built here, stage by stage

We don’t hand you a start date and disappear. Here’s the actual sequence, so you know what’s happening on your property and when you need to make a decision.
Stage 1: Site walk and layout (day 1, about an hour)
We measure the approach, check where the slab meets the street apron, and look at what’s under the old surface. On Paradise lots, that often means discovering the original pour sat on 2 inches of compacted dirt rather than a proper aggregate base. You decide the width and whether you want a widened apron for a second vehicle. This is also when we flag drainage direction, because a driveway that sheds water toward the house is a repair waiting to happen.
Stage 2: Demo and haul-off (day 1 – 2)
A standard two-car driveway comes out in one day with a skid steer and a breaker, and the debris goes into a dumpster on site. Tight alley-load properties in Paradise take longer because the machine has to stage in the alley and the truck can’t block the shared access. Budget an extra half day if your driveway is only reachable from behind the house.
Stage 3: Base prep and grading (day 2 – 3)
This is the stage that determines whether your driveway cracks in year three or holds for thirty. We excavate to 6 – 8 inches, compact Class 2 aggregate base in lifts, and set the slope so water runs to the street or a drain. You’ll see the base before we pour. If you want to look at it, come out and look at it.
Stage 4: Forming, rebar and pour (day 3 – 4)
Forms go up, #4 rebar goes on 18-inch centers, and we call for inspection where the jurisdiction requires it. The pour itself takes a morning. You choose the finish before this day: broom, exposed aggregate, or a light stamp. Control joints get cut within 24 hours, and that timing isn’t negotiable in Paradise heat.
Stage 5: Cure and seal (day 4, then 5 – 7 days)
Concrete doesn’t dry, it cures, and it needs moisture to reach strength. In summer we cover and mist the slab because a Paradise afternoon at 110°F will flash-dry a fresh surface and cause surface cracking. Stay off it for 48 hours, keep vehicles off for 5 – 7 days, and plan a sealer coat at 28 days. That’s your timeline, in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The concrete options you’ll actually choose between
Most of the decisions happen before demo day. Here’s what moves the look, the price and the lifespan.
- Standard broom finish: The default for a reason. Good traction, hides tire marks, and keeps you near the low end of the $4,500 – $12,000 range. Suits rental properties and anyone who wants function over show.
- Exposed aggregate: More texture and a warmer look, usually 10 – 20% above broom. It ages well in Paradise sun but the surface is harder to shovel and harder to patch if it ever chips.
- Stamped or colored concrete: The premium end of the range. Looks right on a mid-century ranch house with a low-pitch roof, but stamping in extreme heat requires a retarder and a fast finisher, so scheduling flexibility matters.
- 4-inch vs 5-inch thickness: Four inches is fine for a car. If a pickup, RV or delivery truck regularly pulls in, go 5 inches with heavier rebar. The upcharge is small; the crack risk without it is not.
- Fiber mesh vs rebar: We recommend rebar on driveways, full stop. Fiber mesh helps with surface shrinkage but doesn’t carry a load across a soft spot.
If the driveway is part of a full Driveway & Pavers in Paradise project that includes a walkway or patio, we plan the pours together so the joints line up and you only pay for one mobilization.
What Concrete Driveways & Concrete Work costs in Paradise, NV

A new concrete driveway in Paradise runs $4,500 – $12,000, and a full replacement (demo, haul-off, new base, new pour) runs $5,000 – $14,000. Those are the market numbers. Here’s what pushes a job from one end to the other.
- Square footage and thickness: A single-car pad is roughly half the concrete of a wide two-car drive. Every added inch of thickness raises material and labor.
- What’s under the old slab: Solid base means a straightforward pour. Clay soil or failed base means excavation and import, which is the single biggest variable in the 89105 ZIP.
- Access: Alley-load and zero-lot-line properties need smaller equipment and more hand work. That’s labor hours, and labor hours are the bid.
- Finish: Broom sits at the bottom, stamped and colored at the top, exposed aggregate in between.
- Permit and inspection scope: A like-for-like replacement is often a lighter review than a widened driveway that changes the curb cut or drainage.
Your written estimate lists demo, haul-off, base, rebar, concrete, finishing, joints, and permit fees as separate lines. What it typically doesn’t include: unexpected underground utilities that need relocation, or driveway sealing, which is a separate line item and its own job. Upfront pricing means the number you see is the number you pay, and if we open the ground and find something nobody could see, we stop and talk to you before we spend your money.
See the difference
Before
After
Before
After
Before
AfterWhat Paradise homes specifically do to this job
Paradise is a strange and useful place to pour concrete, because the housing stock runs from 1950s – 70s tract homes and apartments to high-rise resort towers, and the construction culture reflects both ends. The commercial side of Paradise is defined by the constant cycle of strip-mall and casino-corridor renovation along the Las Vegas Strip and Convention Center, where work gets phased around 24/7 operations and strict Clark County commercial codes. Residential-only subs never deal with that. We do, and it shows up in how we plan a pour around a shared alley, a delivery window, or a neighbor’s fence line.
The other thing that matters here is heat. Extreme summer sun dictates when concrete gets placed, how fast it’s finished, and whether it needs a curing compound. We don’t pour a driveway at 2 p.m. in July and pretend it’ll be fine. On older residential blocks in the 89105 ZIP, we regularly see slabs that were poured thin over clay soil with no aggregate base, and they show it: corner cracks, settled slabs pooling water at the garage door, and joints that have open up an inch wide. That’s prep problem more than a concrete problem. Crews working near the resort corridor also know the dust-control and night-shift realities of building around active operations, which is why scheduling discipline matters as much as mix design. We cover the whole of Paradise and the surrounding communities.
Serving Paradise, NV – Our Local Coverage Area
We serve Paradise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Concrete Driveways & Concrete Work in Paradise

A standard residential driveway takes 2 days for demo and prep, 1 day to pour and finish, then 5 – 7 days of curing before you drive on it. Tight alley-load lots can add a half day. Call (888) 282-1693 and we’ll give you a date range before you commit.
Often, yes, and it depends on scope. A like-for-like replacement on a residential lot is typically a lighter review, while widening a driveway, changing a curb cut or altering drainage usually triggers a full permit and inspection. We pull the permits and manage the inspection, and the fee shows up as its own line on your estimate.
In most cases, yes. Existing water, gas and sewer laterals usually sit deep enough to pour over, and a driveway replacement rarely requires structural work. We confirm utility locations before demo, and if something sits too shallow to pour over safely, we tell you before the concrete truck arrives, not after.
Replacement typically runs $5,000 – $14,000, and a new driveway installation runs $4,500 – $12,000. The difference comes down to demolition, haul-off, base condition and finish. Call (888) 282-1693 for an exact quote. Estimates are free and come with a written line-item breakdown.
Every concrete project is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That covers workmanship for two full years, and it’s in writing, not in a verbal handshake. Our technicians have up to 12 years of experience with concrete placement and finishing.
Get a free estimate for Concrete Driveways & Concrete Work in Paradise
Call (888) 282-1693 and a live person answers, any hour. We’ll ask about your driveway size, access, and what’s under the current slab, then schedule a free on-site estimate. You get a written line-item quote with demo, base, rebar, concrete and finishing broken out, plus permit fees if they apply. No pressure and no vague number. When you’re ready for the wider scope, see our Driveway & Pavers service, and homeowners often pair this with ADU Site Prep & Utilities in Paradise or Door Installation in Paradise once the slab is in.
Written by the team at Groundwork Construction Co.












